Site Photos
High-resolution, dated photographs tied to specific rooms or components with captions and orientation notes to support later comparisons and claims.
A clear pre-rehab inspection reduces uncertainty, supports accurate cost estimates, identifies code or safety issues early, and documents baseline condition. That documentation improves decision-making for budgeting, lender approvals, contractor selection, and regulatory compliance.
Each party uses the inspection to reduce surprises during construction and to create an auditable baseline for future disputes or claims.
High-resolution, dated photographs tied to specific rooms or components with captions and orientation notes to support later comparisons and claims.
Room-by-room checklist covering finishes, fixtures, windows, doors, flooring, and visible structural concerns for consistent, repeatable assessment.
Basic operational checks of HVAC, plumbing, electrical, and water heaters, plus notes on deficiencies requiring specialist follow-up.
Identify obvious code violations, accessibility gaps, and permit needs so the project plan can include required corrections and inspections.
Preliminary line-item cost ranges and contingency assumptions tied to observed conditions and common repair unit pricing.
Proposed sequencing, critical-path items, and expected lead times for permits, long-lead materials, and trade availability.
| Field | Configuration |
|---|---|
| Assign Roles | Inspector | Reviewer | Approver |
| Authentication | Email link | SMS code | Optional KBA |
| Form Fields | Photos, checklists, numeric estimate fields |
| Storage | Cloud folder | Retention policy enforced |
Confirm retention, access controls, and export options to meet internal policy and any regulatory requirements.
Schedule at least 3–7 business days before contractor bidding begins.
Deliver the draft inspection report in 3–5 business days after the site visit.
Allow stakeholders 3–7 business days to review and request clarifications.
Identify required permits within 7–14 days to start permit application process.
Final scope and estimates signed within 10 business days after review closure.
Confirm objectives, access, and documentation checklist before arriving on site.
Perform the walkthrough, capture photos, and note immediate hazards or critical failures.
Compile findings, cost estimates, and prioritized repairs into a dated deliverable.
Stakeholders review, approve scope, and sign to authorize contracting and draws.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
A small investor orders a pre-rehab inspection before closing to identify major defects
A nonprofit documents unit conditions to comply with grant requirements