Scope of Work
Detailed description of demolition, substrate preparation, flashing, ventilation, insulation changes, material brands and specific product lines, color, and measurable acceptance criteria for finished roofing surfaces.
A well-structured Project Management Re-Roof Proposal reduces ambiguity about scope, cost, and schedule, which lowers project risk and supports permit and insurance processes. It provides a defensible baseline for change orders, payment milestones, and warranty obligations while documenting consent and authorization from stakeholders.
Project managers, general contractors, property owners, asset managers, and insurance adjusters commonly prepare, review, or approve re-roof proposals.
The signatory mix depends on ownership, financing, and corporate authority; ensure the named signer has explicit signing authority to bind the entity.
A licensed or certified project manager coordinates contractors, secures permits, and tracks milestones. They confirm scope alignment with structural reviews, manage subcontractor schedules, and act as the primary contact for change orders and on-site inspections. Authorizes progress invoices within delegated approval limits.
The owner (individual or corporate) approves budgets, signs contract documents, and accepts final deliverables. For corporate owners, the authorized signer should be named in corporate resolution or delegated signing authority to avoid later challenges to execution.
Detailed description of demolition, substrate preparation, flashing, ventilation, insulation changes, material brands and specific product lines, color, and measurable acceptance criteria for finished roofing surfaces.
Line-item pricing for labor and materials, change-order rates, deposit schedule, progress payment milestones, retainage if applicable, and final payment terms including invoicing instructions.
Start date, estimated completion date, critical-path items (permit issuance, material lead times), weather contingency allowances, and procedures for schedule adjustments.
Responsibility allocation for obtaining permits, cost allowances, required inspections, and timelines for passing municipal or third-party inspections before final acceptance.
Required liability and workers’ compensation limits, certificate of insurance instructions, additional insured endorsements, and indemnity terms for property damage or third-party claims.
Manufacturer and workmanship warranty durations, warranty transferability, required maintenance, final documentation list (as-built drawings, closeout checklist, lien waivers).
| Field | Configuration |
|---|---|
| Project Address | Required field; validate with address autocomplete |
| Signature | Require signer name + date; enable signer authentication |
| Attachments | Allow PDFs and photos (max size per file) |
| Routing | Sequential signers: PM > Owner > Insurer (if required) |
Ensure the platform supports required authentication, document formats, and secure storage to meet compliance and audit needs.
Choose settings that balance signer convenience with required proof of identity and maintain tamper-evident records for audits and warranty claims.
Provide clear, dated photos of roof condition, problem areas, and adjacent structures to document existing conditions and support scope decisions.
Include manufacturer data sheets, warranty terms, and installation instructions for proposed roofing products to ensure warranty eligibility and code compliance.
Attach drafts of required permit forms or evidence of permit application to show timing and responsibility for municipal approvals.
Provide current certificate of liability and workers’ compensation with required endorsements and policy effective dates to protect owners and subcontractors.
Commonly 30–90 days; specify expiration of quoted pricing.
Allow 2–8 weeks depending on jurisdiction and permit type.
Start date or 'within X days of permit issuance'.
Specify estimated duration and weather contingency.
State if warranty begins at final acceptance or issuance date.
Document delivered to owner and stakeholders for review.
Permit application submitted and approval awaited.
Mobilization and site safety setup completed.
Punch list resolved and final acceptance recorded.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |