Project Management Repairs Change Order

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

PROJECT REPAIRS CHANGE ORDER

Project Identification

Project Title:

Project ID:

Client Name:

Service Provider:

Project Manager:

Change Order No.:    Date Issued:

Scope of Repair Work (Change Description)

Deliverables and Acceptance Criteria

Acceptance Criteria for Deliverable 1:

Acceptance Criteria for Deliverable 2:

Timeline and Milestones

Original Contract Completion Date:

Revised Completion Date (if changed):

Budget, Pricing and Payment

This Change Order will (check all that apply):

  Affects contract price      Affects schedule      Requires expedited approval

Quantity:    Unit Cost:    Line Total:

Quantity:    Unit Cost:    Line Total:

Total Change Order Amount: $

Change Order Administration

Change orders shall be effective only when signed by authorized representatives of both Client and Service Provider. Upon execution, this Change Order modifies the original contract only to the extent expressly stated herein. All other terms and conditions of the original contract remain in full force and effect unless amended in writing.

Claims for additional costs or time extensions not described in this Change Order must be submitted in writing within seven (7) calendar days of the event giving rise to the claim. The Service Provider shall maintain contemporaneous records substantiating any claim for additional compensation or time and shall make records available for Client review upon request.

Warranty, Liability and Insurance

Service Provider warrants that all repair work performed under this Change Order shall be free from defects in materials and workmanship for a period of from the date of acceptance, unless otherwise noted. Warranty obligations under this Change Order shall be in addition to, and not a limitation of, any other warranty or remedy provided in the primary contract.

Confidentiality and Data

Both parties agree that proprietary information exchanged in connection with this Change Order shall be treated as confidential. Confidential information shall not be disclosed to third parties except as required by law or as necessary to perform the obligations under this Change Order. Each party shall undertake reasonable measures to protect confidential information from unauthorized disclosure.

Governing Law and Dispute Resolution

This Change Order shall be governed by and construed in accordance with the laws of the jurisdiction identified in the original contract. Disputes arising under or relating to this Change Order shall be resolved in accordance with the dispute resolution procedure set forth in the original contract; if no procedure exists, the parties agree to submit the dispute to binding arbitration in the governing jurisdiction.

Acknowledgment and Authorization

By signing below, the undersigned represent and warrant that they are authorized to execute this Change Order on behalf of their respective parties, that they have read and understood the terms set forth herein, and that this Change Order constitutes the entire agreement between the parties with respect to the subject matter herein.

Client

Printed Name:

By:

Date:

Service Provider

Printed Name:

By:

Date:

Enter text✕

What the Project Management Repairs Change Order Is

A Project Management Repairs Change Order is a written amendment used to alter the scope, cost, or schedule of repair work agreed in an existing project contract. It documents requested or authorized changes, explains the reason, quantifies cost and time impacts, and becomes part of the contract once signed by authorized parties. Change orders create a clear paper trail for approvals, cost tracking, payment adjustments, warranty effects, and potential lien or dispute resolution, and should reference the original contract number and effective date for clarity.

Why a Formal Change Order Matters

A formal change order reduces ambiguity by documenting scope, price, schedule shifts, and approvals so stakeholders share the same expectations and risks.

Why a Formal Change Order Matters

Who Typically Prepares and Signs These Change Orders

Project managers, site foremen, contractors, subcontractors, property managers, and owners commonly prepare or approve change orders during repair projects.

  • Project Manager — Prepares scope adjustments and circulates for approval; documents cost and schedule effects.
  • General Contractor — Countersigns to authorize subcontractor-led repairs or to accept revised terms.
  • Property Manager / Owner — Reviews budget impact and grants final contractual authorization before additional work starts.

Use the listed roles below to confirm who should draft, review, and sign the change order before work proceeds.

Typical Signatory Profiles

General Contractor

A GC signs to authorize subcontractor changes and accepts revised budgets and schedules. Their approval often triggers purchase orders, subcontractor release forms, and lien waiver processes to protect project cash flow and lien rights.

Property Owner

Owners review cost and schedule impacts and sign to create binding change-of-scope terms. Owner signatures are required when funds or warranty obligations are affected or when contract price thresholds are exceeded.

Essential Security and Compliance Elements

Encryption: TLS 1.2/1.3 in transit; AES-256 at rest
Audit Trail: Timestamped signature record retained
Access Controls: Role-based permissions and SSO
BAA Requirement: BAA required when PHI involved
Retention: Tamper-evident archival available
Certifications: SOC 2 Type II, ISO 27001

Consequences of a Defective Change Order

Payment Delays: Payments withheld or disputed
Contract Disputes: Claims for extra work
Lien Exposure: Unpaid subcontractor liens possible
Regulatory Risk: Permit violations or stop-work
Warranty Loss: Warranty coverage may change
Tax Reporting: Incorrect cost allocation

Common Preparation Pitfalls to Avoid

  • Vague scope descriptions that omit precise locations, materials, or quantities leading to contractor-owner disagreements and rework.
  • Lack of signature authority—unsigned or signatory without delegated authority can render the change order unenforceable.
  • Failing to document schedule impacts, causing misaligned expectations about completion dates and cascading subcontractor conflicts.
  • Ignoring permit or code implications; some repairs require municipal permits that change order approvals must explicitly reference.

Step-by-Step: How to Complete a Repairs Change Order

Follow these core steps to create a clear, enforceable change order and reduce later disputes.

  • 01
    Identify Issue: Describe the defect or change with location and photos.
  • 02
    Propose Scope: List tasks, materials, and quantities in detail.
  • 03
    Quantify Costs: Provide labor, materials, markups, and total cost.
  • 04
    Obtain Signatures: Get authorized signatures and date each signature.

How a Change Order Moves Through Approvals

A simple routing flow ensures required stakeholders review and authorize changes before work begins.

  • Draft: Project team drafts change order and attaches supporting documents.
  • Review: Owner, PM, and accounting review cost and schedule effects.
  • Sign: Authorized parties sign and date the document.
  • Execute: Work proceeds after signatures; copies archived for records.

Core Components of a Professional Change Order

Include these elements to make the change order unambiguous, auditable, and enforceable.

Reference Data

Original contract number, project name, client and contractor legal names, and effective date to connect the change order to the parent agreement.

Detailed Scope

Clear, itemized description of work to be added, removed, or altered, including location, materials, dimensions, and any attached drawings or photos.

Cost Breakdown

Line-item labor, materials, equipment, taxes, overhead, markup, and total net change so stakeholders can verify calculations.

Schedule Impact

New start and finish dates, critical-path effects, and milestone adjustments with a clear statement of who bears delay risk.

Approvals

Signature blocks for authorized signers, printed name, title, date, and, where required, witness or notary information.

Attachments

Supporting documents such as photos, vendor quotes, permit copies, and revised drawings to substantiate the change.

How a Change Order Differs from Related Documents

Compare similar document types to pick the correct instrument when altering repair scope, price, or schedule.

Document Type Typical Use Signature Needed
Change Order modify contract scope
Amendment alter contract terms
Supplemental Agreement add separate obligations
Purchase Order buy materials/services

Practical Tips to Keep Change Orders Clean and Effective

Follow a consistent template and approval process to reduce disputes, speed payment, and maintain auditability.

Use a Standard Template
Adopt a single change order template with mandatory fields for scope, cost, dates, attachments, and signatures so reviewers know where to look and approvals are consistent.
Attach Evidence
Include photos, vendor quotes, and permit references to substantiate costs and justify schedule adjustments; supporting documents reduce later disagreements.
Record Approvals
Capture signatory titles and delegated authority. If using electronic signatures, retain the audit trail showing signer IP, timestamp, and authentication method.
Coordinate Accounting
Map change order totals to cost codes and change management ledgers before approval to streamline invoicing and prevent payment disputes.

Real-World Examples of Repairs Change Orders

Two short case summaries illustrate typical scenarios and practical outcomes when change orders are used correctly.

Case Study: Condominium Roof Repair

A roof leak required additional decking replacement and flashings

  • Contractor supplied itemized quote and photos
  • Owner signed the change order within three days, enabling insurance billing and avoiding warranty disputes by documenting the approved scope and cost.

Case Study: Hospital HVAC Retrofit

Unexpected asbestos removal added scope during system replacement

  • Project team issued a change order with abatement vendor quote
  • The documented authorization and BAA-compliant workflows preserved compliance while allowing work to proceed without project shutdown.

eSignature Vendor Pricing and Feature Snapshot for Change Orders

Compare basic vendor pricing and key capabilities relevant to executing change orders and collecting enforceable approvals; signNow is listed first per vendor comparison guidelines.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day trial Varies by plan Varies by plan Varies by plan Varies by plan
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Common Questions and Problem Solving

Answers to frequently asked questions about preparing, signing, and enforcing repair change orders, and how to resolve common issues.