Title Block
Contains project name, drawing title, sheet number, revision number, preparer, date, and contract reference so the sheet is uniquely identifiable.
Clear, approved shop drawings reduce rework, speed fabrication, and clarify responsibilities between contractors and design teams. They lower risk by documenting coordination, provide an audit trail for change orders, and support permits, inspections, and progress billing.
Several parties prepare, review, or act on shop drawings during design and construction phases.
Proper distribution and version control ensure all stakeholders work from the latest approved set.
The project manager typically coordinates preparation and distribution, verifies coordination with schedule and budget, and signs internal approval blocks when delegated authority exists under the contract.
A licensed design engineer or architect provides formal review and approval stamps for technical compliance; their sign‑off confirms the shop drawing conforms to contract drawings and specifications.
Contains project name, drawing title, sheet number, revision number, preparer, date, and contract reference so the sheet is uniquely identifiable.
Chronological revision table with dates, descriptions, and approver initials to support version control and trace change history.
Indicate drawing scale and show critical dimensions, tolerances, and referencing to ensure accurate fabrication and field fit.
List materials, finishes, fasteners, and specification references to align procurement with contract requirements.
Conflict resolutions, interface notes, and MEP routing information that prevent clashes during installation.
Design professional and contractor approval stamps, signature, and date fields that document formal acceptance.
| Field | Configuration |
|---|---|
| Version Control | Auto‑increment revision and retain prior versions |
| Reviewer Roles | Assign architect, engineer, and contractor reviewers |
| Authentication | Email link or SMS code signer verification |
| Audit Trail | Record timestamps, IP, and approval actions |
Use platforms that support common CAD/PDF workflows, versioning, and secure access controls.
Confirm platform compatibility with project tools and retention requirements before accepting electronic submissions.
Submit with transmittal; typical contractor practice is within 10 business days of request.
Design reviewers commonly allow 5–10 business days per review cycle.
Respond to comments and resubmit within agreed 3–7 business days where noted in the contract.
Receive stamped approval and date before ordering or fabricating components.
Do not begin fabrication until the approved shop drawing set is issued to the fabricator.
Create complete shop sets and coordinate across disciplines before submission.
Transmit with clear revision status and supporting notes to reviewers.
Design team checks compliance, performs markups, and issues comments or approval.
Approved set released to fabricator with approval stamp and date.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7‑day trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |