Identification
Record door location, unique door and frame IDs, manufacturer, label numbers, fire-rating, and building grid references so items are unambiguous during inspection and repair scheduling.
A Project Management Smoke Doors document centralizes acceptance criteria, reduces rework, and preserves evidence needed by building officials and owners. It identifies responsibilities, tracks corrective actions, and creates an auditable record that supports permit approvals, certificate of occupancy requests, and contractual warranty obligations.
Typical users include general contractors, specialty door installers, certified fire door inspectors, architects, and code officials who manage or verify smoke door compliance.
The form supports cross-disciplinary coordination and acts as a single source of truth for project teams when addressing inspections, corrections, and final acceptance.
Record door location, unique door and frame IDs, manufacturer, label numbers, fire-rating, and building grid references so items are unambiguous during inspection and repair scheduling.
Detailed checkpoints for gaps, clearances, smoke seals, hardware operation, threshold condition, and visual label verification with pass/fail criteria tied to manufacturer guidance and applicable code sections.
Document functional tests such as closing speed, latch engagement, and smoke leakage where required, including tester name, test time, instruments used, and any measured deviations.
List deficiencies, assign responsible party, identify required materials, set completion dates, and include verification steps and evidence until items are closed.
Provide acceptance fields for installer, inspector, contractor, and owner or AHJ with printed name, title, signature, and date to create a formal record of final acceptance.
Include manufacturer datasheets, calibration certificates, labeled assembly photos, shop drawings, and permit references to substantiate compliance and support post-install audits.
| Field | Configuration |
|---|---|
| Authentication Level | Email plus SMS one-time code for signer authentication. |
| File Format | PDF/A recommended for archival and tamper-evident storage. |
| Audit Trail | Enable full activity log, timestamps, and IP capture. |
| Access Control | Role-based permissions and edit restrictions for secure review. |
Platforms should support secure PDF upload, tamper-evident audit trails, integration with project management tools, and configurable authentication methods.
Within seven days of installation completion.
Typically 10–30 days depending on contract terms and severity.
Book within seven business days after corrective work completion.
Obtain sign-off before submitting for certificate of occupancy.
Retention period begins on the final sign-off date.
Ordering, delivery verification, and storage inspection prior to installation.
Mounting, hardware fitting, and gap adjustments to manufacturer specifications.
Functional and labeled assembly checks performed by a qualified inspector.
Corrective items closed and formal sign-off recorded with dates.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |
Brian Fitzgibbons, COO at Optica Ventures used digital forms for project signoff.
Kodi-Marie Evans, Director of NetSuite Operations at Xerox integrated signed records with enterprise systems.