Scope of Work
Define system capacity, battery chemistry, mounting, inverter/PCS interfaces, site work, sequencing, and any exclusions. Be explicit about responsibilities for site remediation, civil works, and grid interconnection support.
A well-drafted SOW reduces ambiguity, shortens procurement cycles, limits scope creep, and provides measurable acceptance criteria that protect both owner and contractor interests. It supports compliance with permitting and interconnection requirements and provides a foundation for progress billing and warranty enforcement.
Typical users range from project owners to on-site contractors and procurement teams who coordinate permits, equipment, and testing.
Use this SOW as the single source of truth for procurement, execution, and handover activities.
The owner signs to accept technical and commercial terms, authorize funding, and confirm acceptance criteria. Their signature binds the organization to payment milestones and the final acceptance process.
The EPC contractor signs to accept scope, schedule, and responsibility for execution, supervision of subcontractors, and warranty obligations. Their signature commits to deliverables, safety standards, and testing protocols.
Define system capacity, battery chemistry, mounting, inverter/PCS interfaces, site work, sequencing, and any exclusions. Be explicit about responsibilities for site remediation, civil works, and grid interconnection support.
List drawings, equipment submittals, test plans, commissioning reports, training materials, and as-built documentation with required formats and delivery timelines.
Show milestones for mobilization, equipment delivery, major installation phases, commissioning, and final acceptance with float and critical-path dependencies.
Specify milestone-based payments, retainage amounts, invoicing cadence, accepted supporting documentation, and remedies for late payment or disputed invoices.
Allocate responsibility for permitting, inspections, utility interconnection applications, and adherence to applicable electrical codes, NFPA standards, and local ordinances.
Describe written change order procedures, cost/time impact evaluation, authorization limits, and dispute escalation to avoid unilateral scope changes.
| Field | Configuration |
|---|---|
| Signer Order | Sequential routing with required signer steps |
| Authentication | Email plus SMS or KBA for higher-risk signers |
| Conditional Fields | Show payment or bond fields only when applicable |
| Audit Trail | Enable timestamping, IP capture, and certificate of completion |
Use platform features that provide tamper-evident signed PDFs, robust audit trails, and secure storage to maintain enforceability.
Date when bidders must return a signed SOW or proposal response.
Project start on site and initial mobilization activities.
Delivery, installation, and pre-commissioning milestones.
Date for system testing and performance verification.
Date when acceptance tests pass and retainage is released.
Confirm site readiness, constraints, and geotechnical inputs.
Long-lead equipment delivered and inspected on arrival.
Mechanical and electrical installation finished and documented.
Functional testing complete and documentation transferred to owner.