Project ID
Unique project identifier and drawing revision references that link the stake out to contract documents and permits.
A professional stake out reduces construction rework, clarifies contractor responsibilities, and documents acceptance criteria for site layouts. It creates a single authoritative reference for location data, enabling safer execution, faster inspections, and clearer contractual handoffs among owners, engineers, and subcontractors.
Several other stakeholders—inspections, safety officers, and owners—use the document as the authoritative field reference.
A licensed or appointed project manager who oversees scheduling, scope, and approvals. This person signs to confirm that the stake out matches project plans and authorizes site work to proceed, accepting responsibility for coordination and change communication.
A state-licensed surveyor or civil engineer who provides coordinate data, stakes physical points, and certifies tolerances. Their signature confirms the survey methods, datum references, and any deviations from plan requirements.
Unique project identifier and drawing revision references that link the stake out to contract documents and permits.
Precise stake coordinates (e.g., lat/long or state plane) with datum and units specified for every control point and stake.
Acceptable horizontal and vertical tolerances for stake placement and thresholds for rework or engineering review.
Field notes listing required materials, embedments, and special conditions such as obstructions or protected zones.
Designated signature and date fields for surveyor, project manager, and contractor acceptance with role titles.
Linked plans, survey sketches, photographs, and inspection checklists included with the stake out record.
| Field | Configuration |
|---|---|
| Required Fields | Make coordinates, dates, and signers required. |
| Signer Order | Set surveyor first, then project manager, then contractor. |
| Authentication | Use email plus optional SMS code for signer verification. |
| Storage | Archive PDF with audit trail to secured repository. |
Ensure your provider supports audit trails, encryption, and archival export to your records system.
Provide stake out at least 3–7 business days before site mobilization.
Surveyor records measurements and publishes results within 48–72 hours of fieldwork.
Contractor should place stakes within 5 business days of receipt.
Request inspections within 2 business days after stake placement.
Signed stake out saved to project archive within 24 hours of final signatures.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |