Scope of Work
Detailed material specifications, fabrication tolerances, surface finish, and shop drawing responsibilities for all steel items.
A clear Project Management Steel Document reduces scope disputes, clarifies acceptance criteria, and aligns milestones with payment triggers, which lowers rework and scheduling risk while protecting lien and warranty rights.
This document is used by project owners, general contractors, steel fabricators, suppliers, and project managers to set obligations and timelines before mobilization.
Use the completed document as a binding project record and attach related exhibits such as shop drawings, mill test reports, and approved change orders.
Project managers usually coordinate document assembly, confirm technical specs with engineering, and approve final acceptance; they sign when granted contractual authority by the owner or contractor in writing.
A supplier or fabricator's authorized signatory—often VP of Operations or Contracts Manager—binds the company to delivery schedules, warranties, and payment terms after internal review.
Detailed material specifications, fabrication tolerances, surface finish, and shop drawing responsibilities for all steel items.
Lead times, staging, delivery windows, site access requirements, and penalties or allowances for late delivery.
Factory and site inspection procedures, acceptance tests, rejected material handling, and hold points.
Process for requesting, pricing, and approving changes to scope, including time impact and documentation required.
Milestone schedule, retainage amounts, invoice requirements, and lien waiver sequence.
Warranty period, remedial obligations, indemnity limits, and insurance requirements.
| Field | Configuration |
|---|---|
| Signing Order | Set owner or contractor first, then supplier, then QA inspector. |
| Required Fields | Make signatures, dates, and payment milestone confirmations mandatory. |
| Authentication | Use email link or SMS code for standard transactions; stronger ID for high-value contracts. |
| Audit Trail | Enable full logs including IP, timestamp, and any authentication steps. |
Choose a signing platform that provides secure storage, an audit trail, and required compliance for your industry.
Ensure the vendor supports necessary compliance frameworks (HIPAA BAA if needed), offers tamper-evident signed PDFs, and provides a retrievable audit trail for disputes.
Specified in calendar days from notice to proceed.
Site acceptance window after delivery and erection.
Invoice within 30 days of milestone completion usually required.
Release timelines tied to project milestones or final acceptance.
Begins on final acceptance date unless contract states otherwise.
Finalize specs and approve supplier prior to issuing PO.
Supplier begins fabrication and produces shop drawings.
Ship, offload, and erect steel per site access plan.
Inspections passed and acceptance certificate signed.
The GC standardized the steel packet to match procurement cycles and reduce RFIs by 40%
A fabricator required mill test reports and delivery windows in every contract
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |