PROJECT MANAGEMENT STEP ADDITION DRAWING

Project Identification

Project ID:     Title:

Step Addition Summary

Step Number:     Step Title:

Drawing Reference No.:     Revision:     Date Issued:

Scope of Work

Deliverables and Acceptance

Timeline & Milestones

Proposed Start Date:     Proposed End Date:

Budget & Change Control

Requires formal change order:     If yes, Change Order Ref:

Responsibilities & Resources

Required supporting drawings/attachments included:

Change Control Procedure

Any modification to this Step Addition Drawing that affects scope, schedule, or cost must be submitted as a written Change Order and approved by authorized representatives of both parties prior to execution of the change. The Service Provider shall not proceed with work that relies on an unapproved change that increases cost or duration.

Legal Provisions

Confidentiality: Each party shall maintain the confidentiality of proprietary information exchanged in connection with this Step Addition Drawing. Confidential information shall not be disclosed to third parties except as required by law or with prior written consent. Confidential obligations survive termination of this document for a period of three years.

Intellectual Property: Drawings created specifically as part of this Step Addition become the deliverables described in the Scope. Unless otherwise agreed in writing, the Service Provider grants the Client a non-exclusive, perpetual license to use the final delivered drawings for the purpose of the Project. The Service Provider retains rights to preliminary designs and internal methodologies unless transferred by written agreement.

Warranties and Liability: The Service Provider warrants that the services shall be performed with reasonable skill and care in accordance with generally accepted industry standards. Except for breaches of confidentiality and willful misconduct, neither party shall be liable to the other for indirect, incidental, or consequential damages. Aggregate liability shall be limited to direct damages up to the greater of the amount paid under this Step Addition or the sum of the costs expressly allocated to the Step.

Governing Law and Dispute Resolution: This document shall be governed by the substantive law of the governing jurisdiction identified below. Parties shall first attempt to resolve disputes through good faith negotiation; if unresolved within thirty (30) days, disputes shall proceed to binding arbitration before a mutually agreed forum or as otherwise required by the main project agreement.

Acceptance & Certification

By signing below, the parties certify that they have read and understood this Step Addition Drawing and agree that the described scope, deliverables, schedule, change control, payment, confidentiality, and legal provisions shall govern the addition of the step and related drawings. Execution below constitutes mutual authorization to proceed in accordance with the terms set forth herein.

Client:

Service Provider:

By:

By:

Date:

Date:

Enter text✕

What the Project Management Step Addition Drawing Is

The Project Management Step Addition Drawing is a formal, project-level drawing and record that documents an added task, construction detail, or procedural step within an existing project plan. It captures the added step’s scope, dimensions, dependencies, responsible parties, dates, and any required approvals so the change becomes part of the project baseline and audit record. These drawings are used to schedule work, assign responsibility, update permits or contracts, and create a verifiable trail for billing and compliance. Use clear versioning and signatures to avoid ambiguity when integrating the addition into ongoing project controls.

Why this Drawing Matters for Project Controls

A Step Addition Drawing standardizes how changes are recorded, assigned, and approved so teams track scope, schedule, and cost impact consistently. It reduces rework, clarifies responsibility, and preserves an auditable record for stakeholders, permitting authorities, and auditors.

Why this Drawing Matters for Project Controls

Who Typically Prepares or Signs This Drawing

Multiple stakeholders sign to ensure the addition is authorized, budgeted, and scheduled before work starts.

  • Project managers and schedulers who capture scope and integrate the step into the critical path.
  • Design professionals (engineers, architects) who provide technical drawings and approve constructability.
  • Contractors and subcontractors who accept the described work, pricing, and schedule implications.

Step-by-Step: Completing the Addition Drawing

Follow this sequence to capture, approve, and integrate a step addition into the project baseline.

  • 01
    Draft the Change: Document scope, location, and technical details clearly on the drawing.
  • 02
    Assign Impact: Record schedule, cost, and resource impacts for the change.
  • 03
    Obtain Approvals: Collect signatures from responsible engineer, PM, and contractor before starting work.
  • 04
    File and Distribute: Version the drawing and share with stakeholders and document control.

Core Components to Include on a Professional Drawing

Ensure the drawing contains these elements so the addition is actionable, auditable, and enforceable.

Title Block

Include project name, drawing number, revision, company, and contact details so the drawing can be quickly indexed and correlated with contract records and permit applications.

Revision History

Record every revision with date, author, and reason for change to preserve an audit trail and to identify which version controlled the executed work.

Scope Notes

Provide concise but specific notes that describe the added step, required materials, and acceptance criteria so field crews and inspectors understand deliverables.

Impact Summary

Summarize schedule, budget, and safety impacts in a single block to support quick approvals and change-order negotiations with stakeholders.

Authority Signatures

Include required signature blocks for design lead, project manager, contractor, and client representative to formalize acceptance and responsibility.

Attachments and References

List related drawings, specifications, permits, and purchase orders so reviewers can verify compliance and dependencies without searching multiple systems.

Essential Data and Security Controls to Record

Signer Identity: Record name and role
Document Hash: Capture tamper-evident value
Audit Trail: Store timestamps and IP
Encryption: TLS in transit, AES-256
BAA Availability: HIPAA BAA option
Retention Controls: Versioning and access logs

Common Preparation Errors to Avoid

  • Omitting the effective date or using inconsistent date formats, which creates ambiguity about when obligations and notices begin.
  • Failing to record revision history or version numbers so teams act on superseded drawings and rework occurs.
  • Using vague scope language such as 'minor adjustments' instead of measurable, inspectable acceptance criteria.
  • Collecting initials only instead of full signatures and dates, making it difficult to prove authorization in disputes.

Consequences of Inaccurate or Unapproved Additions

Schedule Delay: Work stoppage risk
Cost Overrun: Unapproved additional charges
Permit Violations: Potential fines or rework
Contract Disputes: Claims and litigation risk
Safety Incidents: Noncompliant work hazards
Record Deficiency: Audit and payment denial

How Electronic Approval and Routing Usually Works

Typical e‑workflow reduces friction by routing the drawing to approvers in a controlled sequence and capturing evidence of each action.

  • Upload: Sender uploads the drawing file to the e‑platform.
  • Place Fields: Add signature, date, and checkbox fields where required.
  • Route: Define signer order or allow parallel approvals.
  • Record: System captures timestamps, IP, and audit trail.

Recommended Digital Workflow Settings

Configure these settings to ensure secure routing and minimal signer friction.

Field Configuration
Signature Field Required | visible name and date
Date Field Auto-fill MM/DD/YYYY
Conditional Step Add when scope > threshold
Authentication Email plus optional SMS code

Technical Considerations for eSubmission

Verify data residency and encryption requirements for any regulated content before routing externally.

  • File Types: PDF, DOCX, and image files
  • Integrations: Connectors for Procore and NetSuite
  • Auth Options: Email, SMS, or KBA

Typical Timing and Processing Expectation

Track these timestamps to keep approvals aligned with schedule and procurement milestones.

Initiation Deadline:

Submit drawing within 48–72 hours of identifying the addition

Design Approval:

Obtain engineering sign-off within 5–10 business days

Permit Filing:

File any permit revisions before construction begins

Procurement Lead Time:

Order long‑lead items immediately after approval

Work Authorization:

Begin field work only after all required signatures

Key Milestones from Request to Closeout

Use these sequential milestones to map the change into the project schedule and monitor progress against approvals.

01

Request Submitted

Change described and drawing drafted for initial review.

02

Technical Review

Engineering confirms feasibility and cost assumptions.

03

Approvals Obtained

Signatures collected from required stakeholders.

04

Closed and Archived

Final version issued and controlled in document register.

eSignature Pricing and Feature Snapshot

Comparison of starting prices and key feature availability across common eSignature providers; signNow is listed first per table convention.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial No No Yes Yes
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Frequently Asked Questions and Troubleshooting

Answers to common questions about completing, signing, submitting, and correcting a Project Management Step Addition Drawing.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users