Project Scope
Define limits of work, existing site conditions, drainage area maps, and design flow assumptions. Include project address, parcel IDs, responsible parties, and any off-site contributions influencing storm drain sizing and routing.
Project Management Storm Drain Plan centralizes design criteria, compliance requirements, inspection schedules, and responsibilities to minimize water quality impacts and regulatory risk. It supports permit compliance, clarifies contractor obligations, improves coordination across trades, and produces the records needed for inspections and enforcement reviews.
Project engineers, general contractors, municipal stormwater managers, and environmental compliance officers typically prepare or review the Project Management Storm Drain Plan during project planning.
Multiple stakeholders use the plan to coordinate work, assign inspections, and document corrective actions for permit compliance and project closeout.
Define limits of work, existing site conditions, drainage area maps, and design flow assumptions. Include project address, parcel IDs, responsible parties, and any off-site contributions influencing storm drain sizing and routing.
List stormwater sizing calculations, basis of design, drainage coefficients, return periods, and reference standards (local code or state manual). Include assumptions for inlet capacities, pipe slopes, and detention requirements.
Specify temporary and permanent BMPs, sediment basins, silt fences, stabilized entrances, and sequencing for installation. Provide inspection triggers and post-storm corrective procedures to limit turbidity and sediment loss.
Provide routine inspection intervals, weather-triggered inspections, responsible inspectors, reporting templates, and escalation paths for deficiencies discovered during construction or after major storm events.
Assign duties for implementation, inspection, maintenance, emergency response, and record retention. Identify contact names, backup personnel, and authority to stop work for noncompliance.
Describe required logs, photographic evidence, inspection reports, corrective action forms, submittal timelines, and where documents are stored for regulatory audits and contract closeout.
| Field | Configuration |
|---|---|
| Signer Authentication | Email link or SMS code; optional KBA for high risk. |
| Conditional Fields | Show inspection details only when inspections required. |
| Storage Location | Choose cloud folder path specified per project. |
| Notifications | Set email recipients and escalation intervals for overdue items. |
Use an e-signature platform that supports PDF, Word, and field-level validation to collect approvals and retain audit trails.
Submit with permit application or before mobilization.
Typical municipal review ranges 15–60 business days.
Within seven days of critical earthwork commencement.
Inspect BMPs within 48 to 72 hours after major storms.
Address deficiencies within 5 business days of notice.
Complete plans, calculations, and BMP specifications before permit submission.
File with municipal or state permitting authority for formal review.
Conduct scheduled and post-storm inspections, document findings, and correct issues.
Deliver as-built drawings, final inspection reports, and maintenance plan for acceptance.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no card | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
Tim Martin used digital workflows to manage property development storm drain documentation for multiple projects across his portfolio.
Optica Ventures integrated storm drain plan approvals into client-facing portals to streamline developer submissions and permit-ready file delivery.
Responsible for integrating the storm drain plan into the construction schedule, assigning inspection responsibilities, and confirming contractor deliverables. Ensures corrective actions are completed, maintains records, and serves as primary contact for permit compliance during construction and closeout phases.
Reviews submitted plans for consistency with local stormwater ordinances, coordinates conditional approvals, and schedules inspections. May require revisions, additional modeling, or bond posting before issuing final acceptance for storm drain work within public rights-of-way.