Scope of Work
Precisely describe areas to be replaced, demolition limits, substrate preparation, tile types, adhesives, grout specification, and edge/trim details to avoid scope disputes.
A clear, professionally prepared proposal reduces ambiguity, aligns expectations across stakeholders, and provides a defensible basis for schedule, budget, and acceptance testing. It supports procurement, permitting, and warranty enforcement while documenting responsibilities and risk allocation.
Project teams, procurement managers, building owners, and general contractors commonly prepare or review tile replacement proposals before awarding work.
The final approved proposal should be signed by authorized representatives from the owner and the contractor to establish contractual obligations.
Authorized representative responsible for approving scope, releasing funds, and signing the proposal; ensures alignment with occupancy and operational constraints and confirms insurance and access.
Individual responsible for coordinating the work, issuing change orders, and accepting completed work per the proposal's acceptance criteria and inspection checklist.
Precisely describe areas to be replaced, demolition limits, substrate preparation, tile types, adhesives, grout specification, and edge/trim details to avoid scope disputes.
Provide milestone dates for mobilization, demolition, installation, curing, inspections, and final acceptance; note impact on occupancy and required shutdown windows.
Itemize labor, materials, equipment, unit rates for additional areas, allowances, taxes, and contingency so change orders can be priced consistently.
Include inspection checkpoints, flatness and bond testing, grout curing times, moisture mitigation procedures, and criteria for rejection or rework.
Define payment schedule, retainage, warranty period, insurance requirements, indemnity, and change order approval process.
Attach drawings, photos, manufacturer data sheets, product certifications, contractor qualifications, and references to support evaluation.
| Field | Configuration |
|---|---|
| Signer Roles | Owner, Contractor, PM assigned in order |
| Conditional Approvals | Route to legal if price exceeds threshold |
| Attachments | Allow PDF, DOCX, and images |
| Reminders | Auto-remind reviewers every 3 days |
Choose a platform that supports secure PDF and multisigner routing, preserves audit trails, and meets compliance needs.
Ensure the service you select can produce tamper-evident signed PDFs and retains an auditable certificate of completion for recordkeeping.
Due by the date in the solicitation or procurement notice
Typically 7–14 days for review and questions
Begin within agreed days after notice to proceed
Complete per milestone dates in the schedule
Submit final invoice and as-built documentation
Document shared with bidders; questions window opens.
Owner signs proposal and issues notice to proceed.
Demolition and substrate prep begin with daily logs.
Punch list cleared and formal acceptance recorded.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes (Premium+) | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
The interface is simple and easy-to-use for our team; more importantly, it is just as easy for our customers.
We felt most comfortable with a SOC 2 certified provider given our compliance needs.