Project Info
Project name, location, contract number, and revision/version to link the checklist to the correct work order and drawings.
A consistent checklist reduces ambiguity, speeds issue resolution, and helps protect parties by documenting conditions, approvals, and outstanding items in one place. It supports quality control, dispute prevention, and project closeout efficiency.
The checklist is used by on-site staff and off-site stakeholders who need an official record of inspection outcomes and assigned follow-up tasks.
Completed checklists become part of project records and are used by operations, procurement, and closeout teams to track completion and compliance.
Project name, location, contract number, and revision/version to link the checklist to the correct work order and drawings.
Walkthrough date, start/end time, and weather or site conditions if relevant to performance or inspection results.
List of participants, roles, and contact details for follow-up and task assignment.
Lined or tabular entries for each element inspected, with pass/fail/status and space for notes.
Clear description of required corrective work, assignee, and target completion date for each nonconformity.
Signature area for parties confirming observations and acceptance; include date/time and optional witness or notarization fields when required.
| Field | Configuration |
|---|---|
| Signing Order | Sequential or parallel routing to stakeholders |
| Authentication | Email, SMS code, or stronger methods as required |
| Attachments | Allow photo uploads and restricted file types |
| Retention | Auto-archive to project folder after completion |
Choose a platform that supports the file formats, authentication strength, and integrations your project uses.
Documents assembled and participants confirmed before site visit.
Inspection performed and items logged in the checklist.
Contractor completes work and updates checklist items.
Owner or PM signs off when all items satisfied.
Usually scheduled within 5–30 days of milestone completion
Owners typically allow 7–30 days for corrective work
Follow-up inspections often within 3–14 days of reported completion
Save signed checklist immediately after final signature
Include checklist in final closeout package and archives
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Plan-dependent | Plan-dependent | Plan-dependent |