Scope
Define precise dimensions, placement, permitted color tolerances, and any exclusions. Include reference elevations, mounting heights, and whether graphics cross seams or require special edge treatments to ensure accurate fabrication.
Using a Project Management Wall Graphics Project consolidates responsibilities, documents design approvals, and creates a reproducible record that supports quality control, contract enforcement, and future maintenance planning while meeting electronic signature requirements under ESIGN and applicable state law.
Project managers, designers, installers, and procurement teams use the Project Management Wall Graphics Project to align scope, costs, schedules, and acceptance criteria before fabrication.
Facilities, legal, and vendor teams reference the document for contract language, warranty obligations, and long-term maintenance planning after installation.
| Field | Configuration |
|---|---|
| Approval Order | Set signing sequence: reviewers, approvers, final signers. |
| Notifications | Enable email and in-app reminders at configurable intervals. |
| Required Attachments | Require artwork, proof of permissions, and permit documents before signing. |
| Authentication | Choose email link, SMS code, or KBA for signer verification. |
Choose platforms that support PDF, DOCX uploads, SSO, API integration, and secure cloud storage to streamline approvals and archiving.
Define precise dimensions, placement, permitted color tolerances, and any exclusions. Include reference elevations, mounting heights, and whether graphics cross seams or require special edge treatments to ensure accurate fabrication.
Reference file formats, color profiles, font licensing, vector requirements, and acceptable file naming conventions. State preferred file transfer methods and checksum or proofing steps to reduce versioning errors.
Specify substrate type, UV resistance, flame rating, finish, adhesive type, and expected lifespan. Include manufacturer data sheets and testing requirements for adhesion and colorfastness under expected conditions.
Detail site prep, anchoring methods, environmental controls, required equipment, crew size, and sequencing with other trades. Include contingency plans for unexpected substrate conditions, safety permits, staging, and fall-protection requirements.
Define measurements, surface finish tolerances, color matching thresholds, inspection checklists, acceptance photos, and criteria for remedial work. Specify sign-off authority and timeline for defect reporting and correction.
Use a formal change-order process capturing requestor, description, cost impact, approval signatures, and schedule adjustments. Track revisions in a version-controlled log attached to the primary document to avoid disputes.
Final approved files must be submitted at least 21 days before fabrication.
Begin fabrication after artwork approval and any required permits are issued.
Schedule installs during declared site-access hours; allow buffer for weather or trade conflicts.
Punchlist items documented at install must be corrected within the specified warranty period.
Signed acceptance marks project completion and starts any warranty timelines and final payment terms.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes (Business Premium+) | Yes (plan dependent) | Yes (plan dependent) | Yes (plan dependent) | Yes (plan dependent) |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |