Project Scope
Define areas to be waterproofed, exclusions, and interface conditions with adjacent assemblies; include square footage and drawing references.
A documented plan clarifies scope, reduces rework, and protects owners and contractors by setting measurable acceptance criteria for waterproofing systems, inspections, and warranty responsibilities under applicable construction law and contract terms.
Typical participants include project managers, waterproofing subcontractors, architects, general contractors, and building owners; each uses the plan to coordinate responsibilities and inspections.
The plan becomes the operational reference during construction and a record for warranty claims and maintenance handover.
Define areas to be waterproofed, exclusions, and interface conditions with adjacent assemblies; include square footage and drawing references.
List approved products, manufacturer data sheets, primer and substrate requirements, and acceptable substitutions with approval workflow.
Schedule installation relative to other trades, specify protection measures, and identify required lead times for inspections and testing.
Specify field mock-ups, adhesion and water-testing procedures, acceptance criteria, and corrective action steps.
Name responsible inspectors, record retention requirements, and required deliverables such as inspection reports and test certificates.
Detail warranty duration, transfer conditions, maintenance instructions, and handover packet contents for owner records.
| Field | Configuration |
|---|---|
| Project ID Field | Required, autofill from template metadata |
| Signature Order | Sequential signer order with reminders |
| Attachments | Allow supporting PDFs and photos upload |
| Retention Rule | Auto-archive signed package to project folder |
Choose a platform that supports PDF, DOCX imports, automated routing, audit trails, and integration with project systems to minimize manual steps.
Ensure the selected vendor provides role-based access controls, audit logs, and the ability to export signed records for contract administration and warranty files.
Submit mock-ups before field installation; typically two weeks lead time
Perform water tests for at least 72 hours before acceptance
Book third-party inspections at least 7–10 days ahead
Begins on owner acceptance or specified commissioning date
Provide closeout package within 30 days of acceptance
Obtain design sign-off and mock-up acceptance before mobilization.
Coordinate protection of adjacent work and substrate readiness.
Install waterproofing according to manufacturer and specification.
Conduct water tests, record results, and address deficiencies.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Available (plan-dependent) | Available | Available | Available | Available |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
A general contractor used a detailed plan to sequence façade and balcony waterproofing
A hospital required infection-control and HIPAA-aware documentation for waterproofing in patient areas
The owner's authorized representative signs to accept the completed waterproofing scope and to trigger warranty obligations. They must be identified in contract documents and possess authority to approve final acceptance and payment.
The general contractor or project manager signs to certify that installation conforms to the plan, coordinate corrective actions, and confirm completion for closeout deliverables and payment milestones.