Title Block
Project name, drawing title, sheet number, revision number, and effective date to identify the drawing and its place in the set.
A signed drawing establishes approval, allocates responsibility for compliance with specifications, and supports permitting and inspections. Under the ESIGN Act (15 U.S.C. ch. 96) and UETA (1999, ULC), an electronic signature can satisfy signature requirements when intent, consent, attribution, and retention are present.
Project Signed Drawings are used across design, construction, and facilities teams; the following roles most often prepare and approve them.
These stakeholders share responsibility for accuracy and timely distribution; clarify signatory authority before issuing drawings to avoid rejection or rework.
A Project Manager reviews the drawing for scope alignment, schedule impact, and contract compliance. Their signature confirms acceptance of the drawing as the basis for work execution and contract administration, and triggers procurement and subcontractor coordination activities.
A Licensed Architect or Engineer signs to certify that the drawing meets professional standards and local code requirements where applicable. Their signature may be required for permit submission and is often subject to professional liability considerations.
Project name, drawing title, sheet number, revision number, and effective date to identify the drawing and its place in the set.
A concise revision log showing changes, revision dates, and authors to track what changed and when.
Scale, general notes, material specifications, and tolerances so the drawing is unambiguous for construction and inspection.
Signature blocks for required parties with printed name, title, organization, and signature date to evidence approval.
Audit trail, signer identity method, and document checksum or certificate to verify e-signature attribution and integrity.
Referenced specifications, addenda, or change order exhibits included or linked to ensure the drawing is complete.
| Field | Configuration |
|---|---|
| Authentication | Email + SMS code or stronger KBA |
| Signing Order | Sequential or parallel per contract |
| Retention | Store signed PDF + audit log |
| Access Controls | Role-based viewer/editor permissions |
Choose distribution channels and integrations that align with your document control and permit submittal needs.
Confirm recipient requirements (format, notarization, certified PDFs) before sending to avoid rejection by permitting authorities.
Submit the signed drawing by the date required in the permit application or review cycle.
Tie drawing approval dates to milestone payments and shop drawing fabrication timelines.
Record signature dates to determine whether changes fall inside or outside a given contract revision period.
As-built signed drawings should be finalized at project closeout to support occupancy or final inspections.
Retention and archival periods typically begin from the signature or project closeout date.
Design team issues initial drawing for internal review and comments.
Technical reviews and revisions are finished and logged in the revision history.
Authorized signers apply signatures and dates to finalize the drawing.
Signed drawing is distributed to contractors, authorities, and archive systems.
| Document Type | Project Signed Drawing | As-Built Drawing |
|---|---|---|
| Purpose | controls work | records completed conditions |
| Signature Need | sometimes | |
| Revision Control | strict | informational |
| Permit Use | primary | supplemental |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |