Scope of Work
A detailed list of systems, structures, and conditions to be inspected, including any excluded items and reference standards such as ASTM or local building code.
Clear, written inspection requirements reduce misunderstanding and disputes by defining scope, deliverables, and timing. They make the inspection repeatable, assign responsibility for repairs, and create an evidentiary record useful for closings and insurance.
Typical users who prepare or receive inspection requirements before an inspection.
Each role uses the document for different downstream steps: negotiations, repair scopes, compliance, or claims.
A detailed list of systems, structures, and conditions to be inspected, including any excluded items and reference standards such as ASTM or local building code.
Access instructions, hours, required safety equipment, and site contact information so the inspector can safely and lawfully enter and complete the inspection.
Specify the inspection standard or protocol to be followed, such as visual-only, invasive testing limits, thermal imaging, or moisture mapping.
Define the report format, required photo documentation, measurement units, narrative vs checklist items, and required file types (PDF, DOCX, images).
Set deadlines for initial report delivery, remedy completion windows, and any reinspection scheduling with associated fees or conditions.
Identify who must sign, acceptable signature methods (electronic or handwritten), notarization or witness needs, and retention requirements for the signed record.
| Field | Configuration |
|---|---|
| Inspection Date Field | Mandatory; MM/DD/YYYY validation |
| Inspector Signature | Required; enable eSignature and timestamp |
| Photo Attachments | Required; limit per site, auto-compress |
| Auto-Routing | Send report to client and lender on completion |
Choose a platform that supports secure signatures, required authentication, and file-format compatibility.
Verify the vendor's compliance with ESIGN and UETA for enforceability, and confirm any HIPAA or 21 CFR Part 11 needs for regulated records.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card | Varies | Varies | Varies | Varies |
| Bulk Send | Yes (Business Premium) | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes (BAA available) | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
A small property manager standardized inspection templates to reduce inspection variance and missed items.
A healthcare-adjacent facility combined inspection checklists with HIPAA-aware photo handling.
Schedule inspection within 7–14 days of request unless contract states otherwise
Require delivery of the full report within 48–72 hours after inspection
Set a 14–30 day remedy window for minor repairs
Reinspections scheduled within 7 days of repair completion
Retention runs from inspection date or report date, as specified