Change Description
Concise narrative of the proposed modification, including location, affected work, and any referenced drawings or specification sections.
A professional Proposal for Change Order reduces disputes, documents authorization and cost allocations, preserves audit trails for claims, and ensures consistent project records for owners, contractors, and subcontractors under applicable laws including ESIGN and UETA.
Ensure the person who signs is authorized under the contract; unauthorized signatures can create disputes or invalid approvals.
Concise narrative of the proposed modification, including location, affected work, and any referenced drawings or specification sections.
Clear statement of which contract items or deliverables are added, modified, or deleted and whether work is additive or deductive.
Line-item pricing with labor, materials, equipment, markups, and assumptions; indicate fixed price or time-and-materials basis.
Number of calendar or working days added or removed, critical-path implications, and required sequencing adjustments.
Designated signatory block(s) for all parties with printed name, title, and signature date to confirm approval.
Supporting documents such as revised drawings, supplier quotes, test reports, or change calculations to substantiate the proposal.
| Field | Configuration |
|---|---|
| Authentication Level | Email link | SMS code | KBA as required |
| Signing Order | Sequential or parallel routing based on contract |
| Mandatory Fields | Enforce cost, signature, and date fields |
| Attachments | Require upload of quotes or drawings |
Validate integrations where change orders update ERP or accounting records to avoid duplicate manual entry and ensure traceability across systems.
Often 7–14 days to accept or counter the proposal
Commonly 14–30 days depending on contract terms
Usually the date of final signature unless contract specifies otherwise
Applied on next invoice cycle; check contract billing terms
Retention begins from execution date for retention timelines
Originator files proposal and attaches supporting documents.
Project leads assess cost and schedule impact.
Authorized signers approve and date the change order.
Update project baseline and retain executed documents.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 env/user/yr | Varies | Varies | Varies |
A small property developer standardized change proposals to avoid site delays
An enterprise integrator centralized change requests into a single workflow
As COO, the signer's role is to confirm business approval and budget availability for change orders. Responsibilities include validating cost estimates, confirming schedule impacts, and ensuring that the change complies with contractual terms before signing.
In smaller organizations the founder or principal often acts as the authorized signer, reviewing both commercial and technical elements and providing final authorization to proceed with the proposed change.