Test Summary
Concise record of pre-mitigation radon tests: location, method, duration, and measured concentrations in pCi/L so decisions rely on documented data.
A well-prepared Radon Mitigation Proposal reduces disputes, supports permit applications, and documents compliance with local rules. It protects homeowners and contractors by setting expectations for performance, materials, timeline, and post-installation testing.
Clear roles and an execution-ready proposal help accelerate permitting, secure client consent, and create a paper trail for warranties, follow-up testing, and any future property disclosures.
The property owner or authorized representative signs to accept scope, costs, and schedule; signature creates contractual obligation and authorizes access for installation and follow-up testing.
A licensed radon mitigation contractor signs to confirm the proposed method, equipment details, warranty terms, and estimated timeline; contractor signature supports permit applications and regulatory records.
Concise record of pre-mitigation radon tests: location, method, duration, and measured concentrations in pCi/L so decisions rely on documented data.
Description of the mitigation approach (sub-slab depressurization, crawlspace ventilation, sealing) and why it suits the property’s construction and test results.
List of fans, piping, junctions, and monitoring components with model numbers, expected lifespan, and estimated power requirements.
Itemized labor, materials, permits, and inspection fees presented as a total and line-item breakout for clarity during approvals and escrow.
Estimated start date, typical duration, and recommended window for post-mitigation testing to verify effectiveness and compliance.
Payment terms, warranty period for workmanship and equipment, exclusions, and responsibility for third-party inspections or follow-up testing.
| Field | Configuration |
|---|---|
| Template Fields | Pre-fill test results, equipment lists, and line-item costs for reuse. |
| Signer Order | Homeowner then contractor to ensure proper acceptance sequence. |
| Authentication | Email link with optional SMS code or ID check for higher confidence. |
| Reminders | Auto-reminders at configurable intervals until signatures complete. |
Ensure the chosen tool supports export to PDF/A for long-term archival and integrates with storage services like Box or Egnyte for centralized records.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
A small real estate firm standardized proposals to close more quickly on sales and repairs.
A property management operator centralized mitigation quotes for multiple units.
| Document | Mitigation Proposal | Test Report |
|---|---|---|
| Legal Purpose | authorize work | record measurement |
| Contains Cost Estimate | ||
| Signature Required | homeowner & contractor | often unsigned |
| Used for Permits | supportive evidence |
Provider issues proposal within 3–7 business days after inspection
Recommend homeowner accept or decline within 14 days to lock pricing
Local building departments typically take 7–30 days depending on workload
Book installation within 7–30 days after signed authorization
Conduct verification testing 24–72 hours after system commissioning
Site visit, diagnostics, and baseline radon testing recorded.
Contractor delivers detailed proposal including scope and cost.
Homeowner signs; contractor files permits where required.
Install system, then run post-mitigation test to confirm results.