Site Plan
Scaled schematic showing building footprint, access points, parking layout, setbacks, easements, and major landscape or grading constraints so review authorities can spot conflicts early.
A clear Concept Design reduces misunderstandings, guides early cost estimates, and speeds decision-making by providing a single reference for scope and constraints. It helps identify zoning, access, and environmental issues early, improving project predictability and reducing rework during later design phases.
Teams that commonly prepare or review a Real Estate Concept Design include owners, developers, architects, civil engineers, and municipal planning staff.
Each stakeholder uses the document differently—owners for decisions, designers for scope, and reviewers for regulatory compliance and risk assessment.
Scaled schematic showing building footprint, access points, parking layout, setbacks, easements, and major landscape or grading constraints so review authorities can spot conflicts early.
Simple three-dimensional or plan-based diagrams indicating overall building volumes, heights, and relationship to street and adjacent properties to demonstrate context and shadow basics.
Tabulated unit counts, square footage by use, gross-to-net ratios, and key adjacencies that define expected occupancy types and major functional relationships.
Primary pedestrian and vehicle access, service routes, loading locations, and emergency egress strategy to confirm functional viability and code compliance possibilities.
Order-of-magnitude cost ranges, high-level phasing sequence, and sustainability targets to support budgeting and schedule decisions.
Summary of applicable zoning, height limits, parking ratios, setback rules, and anticipated discretionary approvals to highlight potential entitlement risks.
| Field | Configuration |
|---|---|
| Signer order | Sequential routing to owner → architect → engineer → planner |
| Authentication | Email link with optional SMS code for reviewer verification |
| Conditional fields | Show permit checklist only if municipal review required |
| Audit trail | Enable detailed logging of IP, timestamps, and actions |
Choose a platform that supports PDF and DOCX import, detailed audit trails, and integrations with your document storage and project systems.
Ensure the chosen platform supports role-based access, audit trails, and the level of signer authentication required by stakeholders and any applicable regulations.
Allow 2–6 weeks to schedule and prepare materials
1–3 weeks depending on project complexity
2–8 weeks, often longer for discretionary hearings
1–4 weeks after receiving concept package
Typically 4–12 weeks after concept approval
Confirm zoning, utilities, and environmental constraints before design options.
Owner signs off on massing, program, and preferred option for further design.
Complete traffic, stormwater, and geotechnical reports as required for permitting.
Assemble detailed drawings and documentation necessary for formal application.
Optica used a concise concept package to move from feasibility to schematic pricing in four weeks
A small developer prepared two concept scenarios to test density options
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card required | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |