Document Purpose
State why the drawings are being submitted (e.g., permit application, lease exhibit, closing exhibit) and the intended use to prevent unauthorized reliance or misinterpretation.
A concise drawings letter reduces misinterpretation, speeds review, and creates an auditable record linking drawings to a transaction or permit. It helps establish who prepared the drawings, the applicable revision, and the intended recipient, which can reduce disputes and processing delays.
Common users include industry professionals who need to attach, summarize, or approve technical drawings as part of a real estate transaction, permit, or construction scope.
The letter is typically retained with closing documents, project files, and permit records to preserve the drawing context and revision history.
State why the drawings are being submitted (e.g., permit application, lease exhibit, closing exhibit) and the intended use to prevent unauthorized reliance or misinterpretation.
Provide the full property address and legal description, including lot, block, subdivision, and county where applicable, so the drawing set is unambiguously associated with the correct parcel.
List each drawing by number and title, indicate the sheet count and attachments, and include cross-references to related documents such as survey plats and structural calculations.
Note the drawing scale, the revision number or letter, the revision date, and a brief description of changes to make clear which version the recipient should rely on.
Include the preparer’s name, firm, license or registration (if applicable), contact information, and a statement of professional limits or certifications when required by regulation or contract.
Provide spaces for signature, printed name, title, and date for the preparer and any approvers; indicate whether notarization or witness signatures are required.
| Field | Configuration |
|---|---|
| Signer Sequence | Define role order (preparer → reviewer → approver) to enforce business process. |
| Authentication Level | Require email or SMS code; use stronger authentication for notarized or sensitive submissions. |
| File Attachments | Attach PDFs and searchable drawings; set required attachments to prevent incomplete submissions. |
| Audit Settings | Enable full audit trail with timestamps, IP addresses, and version history for evidentiary records. |
Confirm recipients accept PDF or DOCX and whether the jurisdiction or stakeholder requires notarized paper copies or RON-certified PDFs.
Verify the receiving party’s preferred format and authentication method before sending to avoid rejections or processing delays.
Expect 14–30 calendar days for initial review; expedited options vary by jurisdiction.
Title companies typically require drawings at least 3–5 business days before closing for review.
Allow 2–7 business days for minor revisions and longer for substantive design changes.
If drawings accompany recorded documents, check county recorder hours and cutoffs to avoid next-day recording.
Retain an executed copy for the recordkeeping period required by your industry or state.
Requester provides scope and required attachments for the drawings letter.
Preparer compiles drawing list, scale, revision notes, and creates the cover letter.
Stakeholders review, request changes, and sign or notarize as required before finalization.
Deliver the signed letter and attachments to title, permitting, and project records.
Tim Martin used drawings letters to replace paper exhibits in sales and leasing packages, reducing review friction and enabling remote approvals.
Optica Ventures standardized a template so every drawing set included a consistent cover letter and revision table, simplifying due diligence.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |