Site & Floor Plans
Scaled drawings showing building footprints, service entrance, meter locations, and branch circuit devices positioned with dimensions and reference keys for each room.
Clear, accurate electrical plans reduce permit delays, avoid rework, and document compliance with building and electrical codes. They support safe installation, accurate cost estimating, and reliable inspection outcomes.
Common participants who create, review, or rely on Real Estate Electrical Plans.
Each participant has distinct responsibilities — designers supply technical accuracy, contractors implement the work, and authorities verify compliance.
Scaled drawings showing building footprints, service entrance, meter locations, and branch circuit devices positioned with dimensions and reference keys for each room.
Detailed panel schedule listing circuit numbers, breakers, loads, feeder sizes, and spare capacity to confirm available service and breaker coordination.
Calculated electrical demand, including continuous and noncontinuous loads, demand factors, and service size determination to ensure code-compliant sizing.
One-line and multi-line diagrams indicating conductor types, conduit paths, overcurrent protection, and routing critical for installation and inspection.
Tables listing fixture types, quantities, mounting heights, control methods, and outlet specifications used for bidding and verification.
General notes, equipment specs, testing requirements, and citations to the applicable electrical and building codes used to interpret the drawings.
| Field | Configuration |
|---|---|
| File format | PDF/A preferred for plan archival and compatibility |
| Template | Use a title block template with revision table |
| Authentication | Require signer identity verification where jurisdictional rules demand |
| Audit trail | Enable timestamps and IP logging for every signature |
Electronic delivery and signing options affect acceptance and traceability; confirm technical requirements with reviewers.
Verify access for reviewers and provide clear versioning to prevent duplicate submissions or misapplied stamps.
1–6 weeks depending on municipality and project complexity
1–3 weeks typical after resubmission with revisions
May follow final review within days to weeks
Scheduled after rough-in installation is ready
Occurs after completion and any required testing
Finalize drawings and calculations before submission to reduce review cycles
File signed documents with the authority having jurisdiction
Address plan-check comments and refile revised sheets
Schedule inspections and obtain final permit approval
Tim Martin streamlined permit submissions by standardizing plan templates and signatures.
Brian Fitzgibbons simplified customer handoffs by providing stamped PDFs with an embedded audit trail.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |