Header
Property address or parcel ID, surveyor name and license number, and the date and time of the observations recorded on the notes.
Clear, dated Field Notes reduce ambiguity at closing, support accurate title work, and lower post-closing disputes by preserving contemporaneous facts and measurements in the transaction file.
Successful use depends on consistent formats, dated entries, signer attribution, and integration into the transaction record.
A listing agent documents visible property defects and fence lines during inspection
A licensed surveyor records boundary monuments and encroachments after site staking
Property address or parcel ID, surveyor name and license number, and the date and time of the observations recorded on the notes.
Short description of why the field notes were taken (survey, listing inspection, appraisal, boundary dispute) and any limitations on access or visibility.
Measured distances, bearings, elevations, coordinate references, and monument descriptions presented in consistent units and with reference points identified.
Descriptions of structures, improvements, encroachments, fences, driveways, utilities, and visible damages that may affect use or title.
Name, signature, and role of the person recording the notes plus a dated signature block to support authenticity and chain-of-custody.
Sketches, photos with timestamps, GPS coordinate exports, and references to formal plats or previous surveys appended to the field notes.
| Field | Configuration |
|---|---|
| Date Field | Use MM/DD/YYYY with automatic timestamping |
| Signature Field | Require printed name, signature, and signer email |
| Attachment Settings | Allow photos, PDFs, and GPS .gpx files |
| Authentication | Enable email and optional SMS code verification |
Ensure the platform can produce an audit trail and export a tamper-evident PDF for long-term retention and review.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |
Provide field notes promptly after site work to avoid stale information
Deliver notes early enough for title companies to resolve exceptions before closing
Record any deed-related instrument within the county timeframe to preserve priority
Schedule notarization within the same day or shortly after signing to maintain contemporaneous records
Begin retention clock on the document creation or filing date
Ensure the notes include signer identification and the required signature block
Notary or platform runs ID verification or KBA per state rules
Collect witness signatures where state law for the instrument requires them
Notary completes acknowledgement or jurat and records the act
If using RON, preserve audio-video and session logs per state requirements
Append photo and GPS attachments before or at signing
Produce a tamper-evident PDF with audit trail
Store signed file in secure records repository with access logs
A licensed surveyor or professional engineer typically signs and certifies field notes; the signature should include license number and state to establish professional accountability and support use in title work.
A broker, listing agent, or company representative may sign observational field notes for transaction files but should not certify technical survey measurements unless licensed to do so.