Site Plan
Shows lot boundaries, setbacks, easements, existing structures, proposed building footprint, driveways, and utilities; used for zoning and permit checks.
A complete Real Estate House Plan clarifies scope, supports permitting and lender underwriting, and reduces title and recording issues. Accurate plans help prevent rework, ensure code compliance, and streamline closing and construction milestones.
Accurate distribution ensures each participant can complete their tasks—permitting, closing, financing, and construction—without unnecessary follow-up.
| Field | Configuration |
|---|---|
| Signature Order | Specify sequential or parallel signer order depending on lender requirements |
| Authentication | Choose email link, SMS code, or knowledge-based verification for signer identity |
| Attachments | Include exhibits: survey, title report, engineering certifications |
| Audit Trail | Enable full event logging and timestamped certificate |
Verify integration with your document storage and title systems to maintain a single source of truth for closing and recordkeeping.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
Shows lot boundaries, setbacks, easements, existing structures, proposed building footprint, driveways, and utilities; used for zoning and permit checks.
Dimensioned layouts for each level identifying room uses, egress routes, stair locations, and window/door schedules for fire and egress compliance.
Exterior views with heights, materials, and roof pitches to support architectural review and neighborhood compatibility assessments.
Basic framing, foundation, and load-bearing notes or reference to engineering plans required for building permit approval.
Certified boundary survey or ALTA/NSPS survey reconciled to the legal description to prevent title and boundary disputes.
Professional stamps, signature blocks, and required notary or witness acknowledgements for recording and lender acceptance.
2–8 weeks depending on jurisdiction
Usually 1–10 business days after submission
3–10 business days after complete submission
Often 2–4 weeks depending on board schedule
Sign and notarize within lender or county timeframe
Tim Martin used digital house plans for a portfolio closing to streamline approvals
Brian Fitzgibbons reconciled a revised site plan with title exceptions before sale