Scope of Work
Describe exact fixtures to be removed and installed, bulb types, wattage, mounting locations, and any structural changes; include model numbers and manufacturer specifications to avoid ambiguity.
A Real Estate Light Replacement Approval clarifies responsibility for costs, records fixture specifications, and documents permission to enter and perform work. This reduces disputes, speeds scheduling, and creates an auditable consent record suitable for contractors, property managers, and legal review.
Property owners, property managers, tenants, and licensed contractors typically complete the Real Estate Light Replacement Approval to authorize fixture work and record responsibilities.
Signatures from authorized parties finalize approval and create an enforceable record under electronic signature laws where applicable.
Describe exact fixtures to be removed and installed, bulb types, wattage, mounting locations, and any structural changes; include model numbers and manufacturer specifications to avoid ambiguity.
State total cost, who pays (owner, tenant, or shared), payment timing, deposits, handling of change orders, invoicing schedule, and acceptable payment methods, and consequences for nonpayment.
Provide installation date range, estimated work duration, contractor arrival window, required access times, and contingency plans for weather or material delays to set realistic expectations.
List required permits, electrical inspections, code compliance references, responsible party for securing permits, and site safety measures including circuit shutdowns and signage.
Document manufacturer and labor warranties, duration, process for warranty claims, transferability, and who retains proof of purchase and warranty documents.
Include signature block with printed name, title, company, email, phone, date, and explicit statement of consent; record whether electronic signatures are accepted.
| Field | Configuration |
|---|---|
| Signer role and signing order | Assign owner, manager, contractor; set signing order |
| Field validation and conditional logic | Require fixture details when 'replace' selected |
| Authentication method and verification level | Email link, SMS code, or ID verification |
| Notifications, reminders, archival, and retention | Auto-send completed PDF to stakeholders |
Use an eSignature platform that supports audit trails, identity verification, PDF export, and secure storage for the approval.
Submit request at least 7 business days before work
Allow local building department 2–6 weeks
Start typically within 3–14 days after approval
Inspection scheduled within 7 days of completion
Retain signed approval per local retention rules
Confirm whether notarization or witnesses are required by local law.
Decide between in-person notarization or Remote Online Notarization (RON) if allowed.
Signers present government ID or complete KBA per notary requirements.
Book notary appointment and provide access link or meeting details.
Signer must sign in view of notary or within recorded session.
Notary attaches acknowledgment, entry to journal, and any county stamps.
Retain RON audio-video or notary journal per state retention rules.
Provide original to property file and distribute certified copies as needed.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no card | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |
Martin Properties moved light replacement approvals online to speed tenant requests and centralize signed authorizations in property files.
Optica Ventures used digital approvals to simplify vendor coordination and maintain a clear audit trail for fixture replacements and service invoices.