Hazard Assessment
A dedicated section listing asbestos, lead, PCBs, mold, and other hazardous materials with attached survey dates and consultant credentials for traceability and abatement planning.
A consistent form reduces safety and environmental risk, supports permit approval, preserves evidence of compliance, and helps limit contractor and owner liability; it aligns recordkeeping with ESIGN/UETA requirements when executed electronically.
Typical parties who complete or rely on the form include contractors, property owners, environmental consultants, and local building officials.
Clear role assignment on the form speeds review, limits rework, and clarifies who must remedy outstanding items before demolition begins.
The owner confirms title, authorizes demolition, and provides known property history. Their signature documents consent to demolition, acceptance of identified pre-demo conditions, and responsibility for permitting and disclosures.
A licensed contractor certifies that pre-demo checks were performed, utilities were disconnected or scheduled for disconnection, hazardous materials were identified and addressed, and that work will follow the approved safety plan.
A dedicated section listing asbestos, lead, PCBs, mold, and other hazardous materials with attached survey dates and consultant credentials for traceability and abatement planning.
Notes on load-bearing elements, signs of collapse, and safe access routes; this guides contractor precautions and temporary shoring requirements during demolition.
Clear entries for electric, gas, water, sewer, and communications: include disconnect dates, provider confirmations, and required permits or hold harmless agreements.
High-resolution photos with captions and timestamps documenting pre-demo conditions; include roof, foundation, interiors, and hazardous material locations to support claims.
Space to list related permit numbers, plan reviewer notes, local ordinance citations, and applicable safety plans or work method statements.
Clear signer roles, full legal names, dates, and certification language for attestation of completeness and accuracy under penalty of law.
| Field | Configuration |
|---|---|
| Authentication | Email + optional SMS code |
| File format | PDF/A preferred for archival |
| Notifications | Auto-email to owner and building dept |
| Retention | Store signed PDF with audit trail |
Confirm file types, authentication level, and integration needs before uploading to a permitting portal.
Ensure the platform preserves an audit trail (timestamps, IP, signer email) and stores a non-editable signed copy for recordkeeping.
Schedule inspection at least 7–14 business days before planned demolition where possible
Submit form and attachments with permit application to local building department
Allow 5–30 business days for review depending on locality and workload
Expect resubmission if hazards or documentation are incomplete
Begin only after permit issuance and utility disconnections confirmed
A regional property manager used the Pre-Demo Inspection Form to consolidate contractor and owner attestations
A development firm standardized the form across projects to reduce ambiguity about signatory roles
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |