Site Plan
A scaled drawing showing property lines, existing structures, proposed building footprints, driveway locations, and any public right-of-way impacts; include scale and north arrow for clarity.
Submitting a clear sketch plan identifies regulatory constraints early, reduces later redesigns, and helps estimate conditions for formal approvals. Early municipal feedback on access, utilities, and zoning conformity can shorten permit timelines and limit avoidable submittals.
Several professional and municipal roles are involved in preparing and reviewing sketch plans; each party plays a distinct role in accuracy and approval.
Coordinating among these parties before submission improves completeness and reduces review comments from the planning authority.
The owner or an authorized representative must sign to attest to accuracy and consent. If an entity owns the property, an officer or authorized agent signs on behalf of that entity; attach evidence of authority when requested by the municipality.
A licensed surveyor or engineer often signs certifying the base mapping and contour information. Their professional stamp or license number may be required for technical acceptance by the planning office.
A scaled drawing showing property lines, existing structures, proposed building footprints, driveway locations, and any public right-of-way impacts; include scale and north arrow for clarity.
Proposed lot lines with approximate dimensions, lot areas, and expected buildable envelopes so planners can evaluate minimum lot size, setbacks, and density requirements.
Location of proposed water, sewer, storm drainage, and access points. Note whether public mains exist or service extensions are required and approximate connection points.
Approximate slopes, high/low points, and critical contours or drainage flow directions. Include constraints like steep slopes or floodplain boundaries where relevant.
Existing recorded easements, wetlands, buffer zones, and any rights-of-way. Show utility corridors and areas restricted from development.
Zoning classification, proposed land use, estimated lot yield, access improvements, and statement of intended next steps for formal platting or site plan submission.
| Field | Configuration |
|---|---|
| File Format | PDF (flattened), layers removed |
| Resolution | 300 DPI for legibility |
| Signer Authentication | Email or SMS code options |
| Routing Order | Owner → Surveyor → Planner |
Many jurisdictions accept or prefer PDF submissions and standard e-signature methods; confirm your municipality's portal requirements before uploading.
Schedule before formal submission; often advisable 2–4 weeks ahead.
Many jurisdictions issue completeness comments within 7–14 business days.
Preliminary technical review commonly takes 30–60 days depending on workload.
Allow 2–4 weeks for applicant revisions and resubmission.
If required, scheduling can add 30–90 days for notices and hearings.
Have the owner(s) sign in presence of notary and witnesses as required.
Complete notary block with seal and date for recorder acceptance.
Witnesses sign and print names where state law requires them.
Provide required number of record copies for filing and staff review.
If allowed, use Remote Online Notarization following state rules.
For RON, retain audio-video recording per state retention rules.
Confirm local acceptance of electronic notarization before use.
Submit notarized documents for recording after approval if required.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | Yes |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
Tim Martin prepared sketch plans for multiple developments to enable remote approvals and faster stakeholder review.
Optica used sketch plan submissions to coordinate survey and utility data before formal platting.