Document header
Property identification, file number, preparer name, and date to make the record immediately searchable and linked to the correct parcel.
A complete, consistent Stairs Document reduces closing delays, clarifies liability for repairs, and demonstrates building-code compliance. Accurate records support insurance claims, simplify permit approvals, and create a clear audit trail in transfers or renovations.
Each user group focuses on different sections—agents on disclosures, inspectors on measurements, and contractors on construction details and permits.
| Field | Configuration |
|---|---|
| File upload | Allow PDF/DOCX uploads; require diagram attachment. |
| Signer authentication | Use email + SMS code or advanced authentication for high-assurance signers. |
| Notary integration | Enable RON workflow if remote notarization is permitted in your state. |
| Retention setting | Configure automated archival and export to secure cloud storage. |
Verify platform compatibility with local recording offices and, if needed, enable RON or in-person notarization workflows before filing.
Property identification, file number, preparer name, and date to make the record immediately searchable and linked to the correct parcel.
Simple plan or sketch showing stair placement relative to property boundaries, entrances, and key rooms for contractor reference.
Tread depth, riser height, stair width, nosing, and total rise measured in consistent units; these inform code compliance checks.
Describe framing, finish, and guardrail components to inform permit classification, structural review, and insurance coverage.
Reference the applicable building code edition or local ordinance sections used to evaluate compliance for clear dispute resolution.
Signed blocks for preparer, owner, and inspector plus date; include notary or witness if contract or local law requires it.
Include clear photos of treads, risers, handrails, and at least one full-view image to corroborate written measurements.
Provide a labeled plan showing measurement points and direction of ascent; annotations reduce measurement disputes.
Attach any existing permit numbers or architectural plan excerpts that relate to the stair installation or modification.
Save the final record as PDF/A for long-term archiving; retain editable DOCX or source drawings for revisions.
Provide the stairs record with property disclosures during the inspection contingency period.
Submit diagrams and measurements with building-permit applications to avoid RFIs from the permit office.
Supply updated documentation when renovations change structural elements to preserve coverage eligibility.
Share the document during bid solicitation to ensure like-for-like pricing.
File final as-built records with owner and archive for future sale or renovation.
Inspector measures and uploads diagrams; photographic evidence captured.
Seller/buyer or project manager validates measurements and notes corrections.
If required, obtain notarization or witness signatures before filing.
Attach to permit, escrow documents, or archive in records management system.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card required | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |