Site Plan
A dimensioned drawing showing property lines, existing and proposed driveway locations, curb cuts, utilities, and distances to structures; scaled plans prevent plan-review rejections and clarify required clearances.
Permits ensure work meets local safety, drainage, and setback rules, reduce liability by documenting approved construction, and preserve the property’s resale clarity. A permit also schedules inspections and creates a public record demonstrating compliance with municipal standards.
Roles may vary by jurisdiction; confirm local rules for who may apply, required contractor licensing, and insurance minimums before submitting an application.
A dimensioned drawing showing property lines, existing and proposed driveway locations, curb cuts, utilities, and distances to structures; scaled plans prevent plan-review rejections and clarify required clearances.
Detailed list of paving type, thickness, base preparation, and drainage features; municipalities often require minimum pavement sections and permeable surface options in specific zones.
Contractor license number, classification, and proof of insurance including general liability limits and additional insured endorsements when required by local code.
For curb cut or curb-lane work include temporary traffic control, pedestrian detour, and signage details where the work impacts public right-of-way or sidewalks.
Information showing how runoff is handled, inlet locations, pervious surfaces, or retention features to meet local drainage and erosion control requirements.
List of required inspections with descriptions—pre-pour, post-pave, final—so applicants know when to request municipal inspections for permit closure.
| Field | Configuration |
|---|---|
| Required Attachments | Site plan | Insurance certificate |
| Signer Roles | Owner | Contractor |
| Authentication | Email or SMS code |
| Inspection Trigger | Auto-notify inspector after payment |
Ensure your chosen platform supports required file formats, signer authentication, and retention policies to meet municipal and legal expectations.
7–30 days for plan review depending on local workload
Inspectors can be scheduled within 1–14 days after request
6–12 months before expiration if work does not begin
Extensions normally require a request before permit expiration
Some jurisdictions allow expedited same-day or 48-hour permits
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
They migrated permit submissions online to centralize documents and signatures
The county introduced an online form with required fields and attachments