Scope of Work
Precise description of removal, roof deck repair, replacement, flashing, ventilation, and cleanup so expectations and exclusions are explicit.
A well-structured proposal reduces disputes by clarifying responsibilities, controlling costs, and documenting warranties and inspection milestones; it also supports permit applications and insurance claims.
The Roofing Project Re-Roofing Proposal is used by contractors, property owners, insurers, and construction managers to agree the work and record obligations before work begins.
Precise description of removal, roof deck repair, replacement, flashing, ventilation, and cleanup so expectations and exclusions are explicit.
Brand, type, color, warranty terms, underlayment, and fasteners listed to avoid substitution disputes and to align with manufacturer warranty requirements.
Line-item pricing for materials, labor, permits, disposal, and taxes plus total price and accepted payment methods to support financing and insurance claims.
Planned start and completion dates, conditions that may delay work (weather, permit delays), and working hours to set a realistic timeline.
Manufacturer and workmanship warranty durations, coverage limits, and instructions for warranty claims and repairs.
Payment schedule, change order process, termination rights, and signature blocks for all contracting parties to create an enforceable agreement.
| Field | Configuration |
|---|---|
| Signature Fields | Assign signature and date fields for owner and contractor; require both to complete routing. |
| Conditional Sections | Show or hide allowance and upgrade sections based on selected materials to keep the document concise. |
| Authentication | Use email plus SMS code or 2FA for higher-value projects to strengthen signer attribution. |
| Storage | Save executed PDFs with audit trail metadata in secure cloud storage for claims and warranty documentation. |
Choose a platform that supports PDF and DOCX, audit trails, and integrations with cloud storage and project tools.
Varies by jurisdiction; typically 7–30 business days for standard roofing permits.
Shingle and underlayment deliveries commonly require 3–14 days depending on stock and season.
Typical residential re-roofing takes 1–5 working days, depending on roof size and complexity.
Common schedule: deposit at signing, progress payment at tear-off, final payment at completion.
Warranty generally begins on completion date or the Effective Date stated in the proposal.
Contractor delivers an itemized proposal after site inspection.
Owner signs proposal and pays any required deposit to reserve schedule.
Contractor secures building permit before starting demolition and replacement.
Final inspection, punch list corrections, and completion sign-off by the owner.
Contractor inspects roof, produces an itemized proposal with shingle options and schedule
Contractor documents storm damage and provides a detailed replacement estimate
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes (Business Premium) | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |