Framing Plan
Scaled drawing showing rafter locations, ridge beam, valleys, hips, and roof pitch; include dimensions and notes on connections.
A clear, complete document reduces rework, supports permit approval, and establishes measurable scope for pricing and warranties. It creates audit-ready evidence of decisions and helps avoid disputes over dimensions, materials, and load ratings.
Multiple parties rely on a Roofing Roof Rafters Document during design, permitting, and construction; responsibilities differ by role.
Assign clear roles: one party prepares the technical content, another verifies code compliance, and the authorized signer accepts financial and contractual terms.
Scaled drawing showing rafter locations, ridge beam, valleys, hips, and roof pitch; include dimensions and notes on connections.
Table listing rafter sizes, species, grade, spacing, and lengths linked to keyed plan callouts.
Design snow load, dead load, live load, and any concentrated loads used for sizing rafters and connections.
Specified lumber grades, fasteners, hurricane ties, hangers, and ROOF underlayment or sheathing types.
Clear statement of included work, demolition, flashing, ventilation, and tasks excluded from the price.
Execution block for contractor, owner, and, where required, a licensed engineer or inspector.
| Field | Configuration |
|---|---|
| Signature Block | Assign signer name and required date field |
| Attachments | Allow upload for attachments such as engineered drawings |
| Authentication | Enable email or SMS code for signer verification |
| Routing | Set signer order: preparer → reviewer → owner |
Ensure the chosen platform supports PDF, Word, and mobile signing and meets any required authentication or compliance needs.
Confirm archive export options (PDF/A), audit trail availability, and whether the provider supports notarization or RON if the jurisdiction or client requires it.
Local review often 2–8 weeks depending on workload and complexity
Engineer approvals typically 1–3 weeks after submission
Schedule inspections at framing and final stages; wait times vary by county
Align payments with permit issuance, framing completion, and final sign-off
Material and workmanship warranties commonly 1–10 years depending on contract
Finalize plans and rafter schedules for review.
Obtain building department sign-off before commencing work.
Install rafters and sheathing for inspection readiness.
Pass final inspection and close permit.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes (premium) | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
A property manager used a framed rafter schedule to streamline permit submission and contractor bidding.
A general contractor attached engineered rafter calculations to bids to win competitive work.