Scope of Work
Describe specific router model, serial numbers, configuration scripts, VLAN assignments, IP addressing, and any included services such as firmware updates, testing procedures, and delivery of as‑built documentation to the customer.
A Router Installation Agreement documents responsibilities, clarifies scope and acceptance criteria, and ties payment to measurable outcomes. It reduces installation delays, limits disputes about equipment and labor, and provides a contractual basis for warranty and support claims while allocating risk between provider and customer.
Typical signers include the party providing installation services, the customer or site owner, and any third‑party technicians or subcontractors engaged for installation.
Collecting signatures from each role ensures accountability for site readiness, equipment handling, and post‑installation support responsibilities.
A named officer or authorized project manager who can bind the installation company and commitments for equipment, labor, warranties, and service levels. Include title and contact details to avoid later challenges to authority.
A facility owner, IT director, or contract administrator with authority to approve work, accept deliverables, and authorize payment. The signatory should be identified by name and job title and, if required, show proof of authority.
Describe specific router model, serial numbers, configuration scripts, VLAN assignments, IP addressing, and any included services such as firmware updates, testing procedures, and delivery of as‑built documentation to the customer.
Define the tests to be run, performance thresholds for throughput, latency and packet loss, the timeframe for testing, and the formal sign‑off process including who may approve and how remediation will proceed.
State the total cost, any deposit, invoicing schedule and payment due dates, applicable taxes, conditions for withholding payment if acceptance tests fail, and remedies for late payment.
Specify hardware and workmanship warranties, duration, included support hours, response SLAs, escalation contacts, and whether on‑site repair or replacement parts are provided under warranty or at additional cost.
List customer responsibilities like providing power, network access credentials, physical access permissions, clear work areas, and any permits or approvals required before technicians arrive.
Allocate risk by capping consequential damages, setting required insurance levels, outlining indemnities for third‑party claims, and clarifying responsibility for data loss or breach during installation.
| Field | Configuration |
|---|---|
| Authentication Method | Email link, SMS code, or KBA |
| Required Fields | Signatures, dates, equipment serials |
| Conditional Logic | Show fields when change orders apply |
| Notifications | Email reminders and completion alerts |
Choose eSignature settings and integrations that meet your authentication and retention requirements before sending the agreement.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
Confirm installation date within agreed lead time (often 3–10 business days)
Technician arrival windows typically given in 2–4 hour blocks
Payment due per contract terms, commonly 30 days after invoice
Warranty begins on accepted installation date or effective date
Archive executed copy immediately with retention metadata
Customer approval of scope and budget triggers procurement and scheduling.
Ordering and shipping of routers and accessories to site for installation.
Technician performs physical install, configuration, and basic verification tests.
Acceptance testing completed and signed off or documented remediation started.
A regional property manager standardized installation terms across 50 properties to reduce vendor disputes and scheduling errors by documenting site access and conduit details.
A small IT services firm used a clear acceptance test section to define throughput and latency thresholds for enterprise routers.