Project Scope
Concise description of affected systems and building areas, retrofit type (e.g., bracing, shear walls, foundation anchors), and what is explicitly excluded from the work scope.
A well-formatted seismic improvement proposal clarifies responsibilities, reduces approval delays, and supports permit and funding applications while helping manage construction risk and cost uncertainty.
The document is prepared and reviewed by people who manage building safety, capital projects, or regulatory compliance.
Accurate proposals streamline permitting, bidding, and execution by clearly aligning expectations among owners, designers, and contractors.
An authorized company officer, property owner, or designated representative who can approve budget, scope, and contract terms and execute agreements on behalf of the asset owner.
The engineer of record or responsible design professional who signs technical sections, certifies compliance with applicable building codes, and takes professional responsibility for calculations and plans.
Concise description of affected systems and building areas, retrofit type (e.g., bracing, shear walls, foundation anchors), and what is explicitly excluded from the work scope.
Summary of inspection findings, damage history, material conditions, and key design criteria used to size retrofit elements and verify code compliance.
Outline of proposed interventions, referenced standards (code editions, ASCE loads), design assumptions, and required construction sequencing or temporary supports.
Line-item budget with contingencies, unit rates, allowances for unseen conditions, and separate cost lines for permits, testing, and specialty consultants.
High-level timeline for design, permit review, procurement, construction, and inspection milestones including critical path dependencies.
List of required permits, anticipated agency reviews, code equivalence notes, and responsibility matrix for permit applications and approvals.
| Field | Configuration |
|---|---|
| Authentication | Email plus SMS code for critical signers |
| Field Types | Signature, date, initials, conditional checkboxes |
| Conditional Logic | Show approvals only after prior signatures |
| Audit Trail | Retain IP, timestamps, and action log |
Choose a platform that supports robust audit trails, accessible signed PDFs, and required security controls.
Ensure the chosen solution can produce tamper-evident signed PDFs, retain records according to regulatory timelines, and support required authentication for signers and, when needed, notarization or RON workflows.
Expect initial intake and completeness review within 30–60 days
Technical review often requires 30–90 days depending on scope
Allow 2–4 weeks for contractor bids and clarifications
Start date depends on procurement and permit issuance
Schedule with authority upon completion of work
Owner approval and permit application initiation
Grant or capital authorization secured
Complete drawings, agency reviews, and permits
Retrofit work finished and inspections passed
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Varies by plan | Varies by plan | Yes | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
Tim Martin used online execution for property documents to speed approvals
BIS prioritized compliance in vendor selection