Scope
Precisely describe excavation, grading, and soil volumes. Specify boundaries, elevation targets, and accepted tolerances so performance can be measured and disputes reduced.
A clear Self Dirt Agreement minimizes disputes by assigning practical responsibilities — who provides equipment, obtains permits, performs soil testing, and pays disposal fees — and by documenting acceptance of site conditions and risk allocation in writing.
Use the agreement when site conditions, permit responsibilities, or cost-sharing require documented acceptance and clear assignment of environmental and operational risk.
Precisely describe excavation, grading, and soil volumes. Specify boundaries, elevation targets, and accepted tolerances so performance can be measured and disputes reduced.
Attach a labeled site plan or exhibit showing work areas, haul routes, stockpile locations, and access points to prevent misunderstandings about site logistics and rights-of-way.
State required testing (e.g., compaction, contamination) and laboratory standards. Define responsibility for sampling, chain of custody, and acceptable results.
Allocate who obtains permits, pays fees, and ensures erosion control, stormwater, and environmental compliance under local and state regulations.
Specify disposal sites, hauling procedures, disposal receipts, and responsibility for contamination remediation or extra disposal costs if material is unsuitable.
Set insurance minimums and indemnity language for property damage, bodily injury, and pollution events, and clarify which party defends and pays claims.
| Field | Configuration |
|---|---|
| Signature type | Allow typed, drawn, or uploaded signatures |
| Authentication | Use email or SMS code verification |
| Conditional clauses | Show permit clause only if owner-obtained |
| Notifications | Auto-send signed copy to each party |
Ensure the chosen service provides tamper-evident signed PDFs, document retention, and export options; consider API or SSO if integrating with project management or accounting systems.
Specify calendar days or milestone dates for finishing work
Require soil testing within 7–14 days of excavation
State who obtains permits and associated timelines
Require written notice within 10–30 days of defect discovery
Keep documentation per retention rules in this guide
A small developer formalized owner-performed grading to avoid contractor confusion
A general contractor required owners to sign a dirt allocation agreement before mobilization
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Plan | 7-day trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |