Scope of Work
Detailed description of services including excavation, tank type, drainfield layout, testing, connections, and any subcontracted tasks; avoids ambiguous language about deliverables.
A clear agreement assigns responsibilities for permits, testing, and compliance, limits disputes over scope or cost, documents inspection milestones and warranties, and creates an auditable record that supports permit reviewers, lenders, and insurers.
The document is used by property owners, licensed septic contractors, and local permitting authorities to align expectations before work begins.
All listed parties should keep signed copies and related permits, and confirm contractor credentials and insurance before work starts.
Detailed description of services including excavation, tank type, drainfield layout, testing, connections, and any subcontracted tasks; avoids ambiguous language about deliverables.
Scaled site plan and soil/percolation test results with reference to jurisdictional code sections and gridlines to locate tank, lines, setbacks, and easements.
Manufacturer names, model numbers, pipe sizes, tank capacity, aggregate types, and any performance standards required by the local authority.
Specify which party obtains and pays for permits, who schedules inspections, acceptable inspection outcomes, and documentation required for completion.
Fixed price or milestone payments, retainage, lien waiver timing, remedies for late payments, and conditions triggering change orders or extra charges.
Contractor warranty period, owner maintenance obligations, response times for defects, and transferability of warranties on resale.
| Field | Configuration |
|---|---|
| Signer order | Owner → Contractor → Inspector |
| Authentication | Email link with optional SMS code |
| Attachments | Permit PDFs and site plans required |
| Reminders | Automated reminders until signed |
Ensure the chosen solution can produce a tamper-evident certificate, retain records reliably, and integrate with your permitting or project management systems for easy retrieval.
Allow 2–6 weeks for local review depending on workload
Plan for 2–8 weeks before work can begin
Often 1–3 weeks, depending on site conditions
Expect 1–2 weeks for inspection availability
Certificate of compliance issued after passed inspection
The signatory should be the recorded owner or an authorized agent with written proof of authority; this ensures permissions for access, easements, and permit applications and prevents future title disputes.
A duly licensed contractor with active credentials and adequate insurance must sign to accept installation responsibility, warranties, and compliance with local health‑department codes.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Yes (trial) | Yes (trial) | Yes (trial) | Yes (trial) |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |