Reservation Details
Requested date, start and end times, and alternate windows for scheduling flexibility and conflict resolution.
Completing the request protects both the building and the party using the elevator by documenting responsibilities, scheduling conflicts, and proof of insurance. It reduces operational disruptions and clarifies cost and damage liability before the move or delivery occurs.
Several roles interact with a Service Elevator Request depending on the property type and scope of the activity.
Clear role separation ensures fast approvals and reduces the chance of access denial or damage disputes during use.
Requested date, start and end times, and alternate windows for scheduling flexibility and conflict resolution.
Weight, dimensions, number of trips, and whether the load requires stretcher mode or special handling.
Materials and methods to protect elevator interior, doors, and lobbies; includes padding and floor covers.
Certificate of insurance with coverage limits and endorsement showing building as additional insured when required.
Primary on-site contact, mover representative, emergency phone numbers, and building operations contact details.
Signature, date, and conditional notes from building operations confirming the reservation and any fees or deposits.
| Field | Configuration |
|---|---|
| Notification | Email to operations and tenant on submission |
| Authentication | Email verification or SMS code for requestor |
| Approval Routing | Route to facilities manager then building engineer |
| Time Slots | Enable selectable windows with conflicts blocked |
Use a secure platform that preserves attachments, timestamps, and an audit trail for each request.
48–72 hours for standard moves
At least 7 business days' notice
48 hours prior to scheduled move
5 business days or longer
24–48 hours before reserved slot
Form and attachments received by building operations for initial review.
Facilities verify dimensions, load limits, insurance, and protection plan.
Slot assigned with conditions and fee details if applicable.
Supervisor inspects after use and documents any damage or fees.
General liability insurance certificate showing coverage limits and any required endorsement naming the building as additional insured.
Proof that the moving company is licensed and bonded as required by local regulations or building policy.
Detailed plan for elevator and lobby protection, padding materials, and personnel responsible for installation and removal.
Proof of payment for any required move deposit or damage hold requested by building management.
The building manager or authorized facilities representative signs to confirm approval, note conditions, and record any fees or deposit requirements. Their signature binds the building to the reserved slot and any operational accommodations.
An authorized mover or contractor representative signs to acknowledge acceptance of protection measures, liability for damage, and adherence to scheduled times. This signature often accompanies insurance attestation.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |