Scope of Work
Detailed description of pier locations, footing dimensions, slab thickness, materials, reinforcement, excavation limits and required tolerances, with referenced drawings or exhibits.
A signed agreement reduces ambiguity about scope, schedules, payments, change orders and inspection acceptance, lowering dispute risk and clarifying lien and warranty rights while supporting compliance with permitting and lender requirements.
The agreement is used by contractors, property owners, lenders, and inspectors to record responsibilities and approval paths before foundation work begins.
Parties rely on the signed contract to confirm scope, permit conditions, payment schedules and post‑completion obligations.
The contractor signs to accept scope, schedule and pricing, certifies compliance with building codes and permits, and agrees to provide required insurance, bond and inspection coordination.
The property owner signs to confirm acceptance of scope, payment terms and inspection checkpoints; the owner’s signature triggers obligations such as progress payments and final acceptance.
Detailed description of pier locations, footing dimensions, slab thickness, materials, reinforcement, excavation limits and required tolerances, with referenced drawings or exhibits.
Material grades, concrete mixes, reinforcement schedules, compaction and testing standards, and any manufacturer product specifications required for compliance and inspection.
Contract price, schedule of progress payments or draws, retainage percentage, invoicing procedure and conditions for final payment upon inspection and acceptance.
Start/finish dates, key inspection windows, permit acquisition responsibilities, remedial deadlines for failed inspections and liquidated damages if applicable.
Procedure for documenting scope changes, approval authorities, impact on price and schedule, and required signatures before work proceeds.
Warranty period, remedies for defects, insurance and indemnity allocation, and any limits on consequential damages or subcontractor liability.
| Field | Configuration |
|---|---|
| Signing Order | Owner first | Contractor second |
| Authentication Method | Email link with optional SMS code |
| Reminder Schedule | Automatic reminders at 3 and 7 days |
| Save Format | PDF/A with audit trail attached |
Choose a platform that supports PDF, DOCX input, secure storage, and the authentication level required by your stakeholders.
Date the agreement takes effect; controls warranty start and notice periods
Planned mobilization date tied to permit issuance and weather windows
Dates for pier inspection, rebar inspection and pre-pour checks
Progress draw schedule linked to completed milestones
Retention cutoff dates for warranty and tax purposes
Agreement signed and effective; permits applied for
Site marked, excavation approved and materials staged
Piers installed, inspected and accepted by authority
Concrete pour completed, cure and final inspection passed
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Available on Business Premium and up | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No envelope cap | 100 envelopes/user/year limit | Varies by plan | Varies by plan | Varies by plan |