Site Plan
Scaled map showing property boundaries, building footprints, setbacks, easements, access points, and proposed grading limits with north arrow and scale noted.
A complete plan reduces permitting delays, clarifies responsibilities, and supports accurate cost and schedule estimates. It documents compliance with local ordinances and technical standards, creates a single reference for contractors and reviewers, and reduces change orders and inspection issues when implemented correctly.
The Site Development Plan is prepared and reviewed by a range of stakeholders across public and private sectors.
Coordination among these groups during drafting and review reduces resubmissions and supports timely permit issuance.
The legal owner or authorized developer representative signs to accept site obligations, bonding, and easements. The signatory should be able to bind the property entity and must match the organization name used in permit applications and legal exhibits when recorded.
A licensed civil engineer, surveyor, or architect signs and seals technical sheets where state law requires. Their signature attests to technical accuracy and compliance with local codes and professional practice standards.
Scaled map showing property boundaries, building footprints, setbacks, easements, access points, and proposed grading limits with north arrow and scale noted.
Existing and proposed contours, spot elevations, cut/fill quantities, and stormwater conveyance plans with calculations for runoff control and detention.
Plans and profiles for sanitary, water, storm, gas, and electrical services including service points, metering, and coordination notes with utility providers.
Best management practices, phased controls, detail sheets, and a maintenance plan to meet local erosion control ordinances during construction.
Construction phasing diagram and milestone dates showing sequence of work, inspection triggers, and critical path items affecting occupancy or permit release.
A consolidated list of required permits, responsible party for each, submittal dates, and conditions or mitigation measures imposed by each approving agency.
| Setting | Requirement | Recommended |
|---|---|
| File Format | PDF | Use flattened PDF/A for permit sets |
| Page Size | 24x36 or 11x17 | Preserve drawing scale |
| Authentication | Email link or two-factor | Use stronger auth for plan certification |
| Versioning | Track revisions | Include revision cloud and log |
Agencies accept plans by a mix of secure portals, email, physical copies, or e-submission platforms depending on local rules.
Use validated integrations (CRM, project management, cloud storage) so records and audit trails remain centralized and retrievable for inspections and as-builts.
Schedule 2–6 weeks before formal submission
1–3 weeks to verify required items
30–60 days typical, may be longer
30–90 days depending on notice periods
After conditions cleared; timing varies
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | Varies |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | Varies | Varies |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |