Site Drawing
Scaled plan view showing property lines, building footprints, driveways, sidewalks, and exact fixture locations with north arrow and scale, enabling spatial coordination with existing site features.
A complete Site Lighting Plan reduces permit delays, clarifies contractor responsibilities, and documents how the design meets electrical and lighting codes. Well-prepared plans protect project timelines and help avoid field changes that increase cost and safety risk.
Typical contributors and reviewers include licensed professionals, project owners, and local authorities who approve electrical and zoning aspects.
Understanding these roles helps assign responsibilities and secure the correct stamps, signatures, or approvals before construction begins.
Scaled plan view showing property lines, building footprints, driveways, sidewalks, and exact fixture locations with north arrow and scale, enabling spatial coordination with existing site features.
Table listing manufacturer, model, lumen output, color temperature, mounting height, photometric distribution, and inventory count to ensure correct procurement and field verification.
Calculated illuminance contours and point-by-point lux/footcandles demonstrating horizontal and vertical lighting levels and compliance with design criteria and local ordinances.
Single-line diagrams, circuiting, switch schedules, dimming and control sequences, and any proposed networked controls or occupancy-based sensors.
Pole types, foundation notes, arm lengths, mounting heights, and conduit entry methods that guide civil and electrical trades during installation.
References to applicable electrical codes, energy standards, dark-sky ordinances, and any required mitigations such as shielding or cutoff fixtures.
| Field | Configuration |
|---|---|
| Template Versioning | Lock approved plan versions to prevent edits after submission. |
| Signer Roles | Assign roles: preparer, engineer, owner, municipal reviewer. |
| Authentication | Require email/SMS codes or stronger ID per jurisdiction. |
| Automated Routing | Route signed copies automatically to all stakeholders for records. |
Choose delivery formats and integrations compatible with reviewers and construction teams.
Often 2–8 weeks depending on local workload and complexity.
Municipalities commonly allow 10–30 days for corrections and resubmittal.
Field inspections may require 3–14 days lead time after request.
Final sign-off occurs after satisfactory inspection and any required fixes.
As-built plans and final documentation submitted at project completion.
Produce sealed drawings and photometrics prior to submission.
Submit files and required fees to the authority having jurisdiction.
Respond to plan reviewer comments and resubmit revised documents.
Inspector verifies installed lighting matches approved plan.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
The interface is simple and easy-to-use for our team; more importantly, it is just as easy for our customers.
I can process and execute all of these documents online with 100% compliance and built-in security.