Site Identification
Full site address, parcel or lot number, legal description and project reference to avoid ambiguity during permitting and contract review.
A well-prepared Site Survey Form reduces design rework, clarifies site constraints for bidders, supports permit applications, documents baseline conditions for disputes, and improves scheduling accuracy across trades.
Several roles collect or rely on site survey information depending on project scale and type.
Assign the person with the most direct site access and technical competence as lead for completion.
Full site address, parcel or lot number, legal description and project reference to avoid ambiguity during permitting and contract review.
Key dimensions, structure footprints, setback distances, elevations, and reference benchmarks with units specified and measurement method noted.
Location and status of water, sewer, gas, electric, telecom lines, and any required permits or clearance requirements for excavation.
High-resolution, dated photos with captions and GPS tags for each image to support visual evidence and change tracking.
Observed environmental hazards, easements, right-of-way constraints, access limitations, and any site-specific safety warnings.
Supporting documents such as existing drawings, prior surveys, utility locates, permits, and contact records for stakeholders.
| Field | Configuration |
|---|---|
| Authentication Method | Email link or SMS code for signer verification. |
| Photo Requirements | Accept JPEG/PNG, set minimum resolution and mandatory caption field. |
| GPS Capture | Optional auto-fill of device coordinates when permitted by user device. |
| Conditional Fields | Reveal additional questions only when related answers trigger them. |
Integrations such as CRM, cloud storage, and project systems keep survey data linked to bids and permits, while encryption and audit trails maintain record integrity and chain of custody.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Criteria | Site Survey Form | Environmental Assessment |
|---|---|---|
| Scope | physical characteristics, access, utilities | environmental risks, contamination potential |
| Primary Use | construction planning and logistics | regulatory compliance and remediation planning |
| Required Testing | visual verification only | often requires soil, water, or air testing |
| Typical Author | surveyor or contractor | environmental scientist or specialist |
Confirm access and permits at least 3–5 business days before planned visit.
Deliver a draft survey within 7 business days of site visit.
Allow 3–5 business days for clarifications or follow-up photos.
Include survey attachments when filing to avoid reviews or resubmittals.
Retention period begins on creation date of the final signed record.
Finalized reports should export as PDF/A for archival, with embedded photos and visible signature blocks for audit purposes.
Tabular measurement and inventory data exportable to CSV or XLSX for estimating and scheduling tools.
Include original photo files with GPS metadata for mapping and geospatial verification.
Attach utility locate reports, prior surveys, permits, and contact lists required for project records.