Header
Project name, site address, parcel or lot identifier, client and surveyor contact information, and an internal reference number for tracking.
Standardizing site surveys reduces rework, aligns teams, and creates an auditable record that supports permitting, contracting, and claims management.
Typical contributors span field, technical, and administrative roles; the list below shows core participants.
Assign clear ownership for each section—who collects data, who verifies it, and who approves the final record.
Project name, site address, parcel or lot identifier, client and surveyor contact information, and an internal reference number for tracking.
Survey date, weather, tide or water level (if relevant), and any temporary site conditions that might affect measurements or access.
Key distances, elevations, building footprints, setbacks, and coordinate references (preferably in NGS or local datum). Include units and measurement method.
Locations and status of underground and overhead utilities, access gates, easements, and nearest public right-of-way with clear notations.
Labeled photos with timestamps and GPS metadata. Reference each photo to the specific survey item or area it documents.
Observations about hazards, environmental constraints, required permits, recommended follow-up actions, and any third-party dependencies.
| Field | Configuration |
|---|---|
| Required Fields | Mark address, date, surveyor name, and photos as required to prevent submission with gaps. |
| Conditional Fields | Show permit-related questions only when the project type triggers them to reduce clutter. |
| File Upload | Allow photo and drawing uploads; set acceptable file types and max size limits. |
| Signer Authentication | Use email or SMS code verification; require licensed surveyor authentication where applicable. |
Choose platforms and settings that preserve metadata, timestamps, and attachments when sharing the completed survey.
Ensure the chosen platform retains an audit trail (timestamps, IP, signer identity) and preserves uploaded photos and geolocation metadata.
Typically within 1–7 days of site visit depending on project urgency.
Allow 1–3 business days for technical verification by the project manager.
Combine survey with drawings; allow lead times per local jurisdiction.
Finalize signatures and archive within 3 business days after approval.
Follow local permit timelines; missing documentation can delay issuance by weeks.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Yes | Yes | Yes | Yes |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |