Establishing secure connection…Loading editor…Preparing document…

Solar Energy Assessment Form

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

Solar Energy Assessment Agreement

Parties

Client Name:

Assessor / Consultant Name:

Recitals

WHEREAS, Client owns or has control of the property identified for potential solar energy generation and desires a professional on-site and technical assessment of the property's suitability for solar photovoltaic (PV) installation; and

WHEREAS, Assessor possesses the experience, technical capacity, and license to perform solar site assessments, shading analysis, and to prepare a written assessment report containing system sizing estimates, production estimates, and equipment recommendations; and

NOW, THEREFORE, in consideration of the mutual covenants set forth below, the parties agree as follows.

Scope of Work

Assessment Details

Inspection Date:

Proposed System Size (AC kW): Estimated Annual Output (kWh):

No significant shading    Partial / intermittent shading    Significant shading observed

Assessor Name:

License / Certification No.:

Payment Terms

Assessment Fee Amount: $

Late Payment Fee (if any):

Term and Termination

Agreement Start Date:

Expected Completion or End Date:

Early termination by Client may require payment for services performed to date and reasonable demobilization costs as set forth in the payment schedule above. Either party may terminate for material breach if the breaching party fails to cure within the stated notice period.

Confidentiality

Assessor shall treat all non-public information provided by Client as confidential and shall not disclose such information except (a) as required by law, (b) to consultants retained to perform the scope of work who are bound by confidentiality obligations, or (c) with Client's prior written consent. Confidential information does not include information that is or becomes generally available to the public through no fault of Assessor.

Client agrees that Assessor may retain copies of the assessment report as part of its business records, subject to the confidentiality obligations above. Client consents to limited use of non-identifying data for Assessor's internal performance analysis.

Limitations, Representation & Warranties

Assessor's assessment is an advisory technical evaluation prepared from visual inspection and available data. Assessor does not warrant future system performance; estimates of energy production are projections based on current conditions and assumptions detailed in the Scope of Work. Client is responsible for confirming compliance with applicable codes, permits, interconnection requirements, and for obtaining any required third-party engineering or surveys.

Acknowledgment of Limitations: I acknowledge and accept the limitations and scope of the assessment.

Governing Law; Entire Agreement

Governing Law: This Agreement shall be governed by and construed in accordance with the laws of the state of without regard to conflict of laws principles.

Entire Agreement: This Agreement, together with any attachments referenced herein, constitutes the entire agreement between the parties with respect to the subject matter and supersedes all prior negotiations, representations, and agreements, whether written or oral. Any modification must be in writing and signed by both parties.

Notices

Acknowledgment

By signing below, the undersigned represent and warrant that they are duly authorized to enter into this Agreement on behalf of the party they represent, have read and understand the terms, and agree to be bound by them.

Client

Printed Name:

By:

Date:

Assessor / Consultant

Printed Name:

By:

Date:

Enter text✕

What the Solar Energy Assessment Form Is

The Solar Energy Assessment Form documents site-specific data used to evaluate the suitability and expected performance of a photovoltaic system at a property. Typical entries include property and owner details, utility usage history, roof and shading observations, structural notes, and recommended system size. Contractors, energy auditors, and financing partners use the form to estimate production, costs, incentive eligibility, and interconnection requirements. The form supports planning, permitting, financing applications, and comparison of multiple proposals for the same site.

Why a Standardized Assessment Form Matters

A consistent Solar Energy Assessment Form improves accuracy, speeds underwriting and permitting, and reduces disputes by recording core facts up front. It creates an auditable record for customers, installers, and third-party reviewers and supports eligibility checks for incentives and utility interconnection.

Why a Standardized Assessment Form Matters

Who Typically Completes or Receives This Form

Common participants fill, review, or rely on the assessment to make installation and financing decisions.

  • Homeowners or property owners who request an assessment and provide utility history and access information.
  • Solar contractors and energy auditors performing site visits, roof measurements, and production estimates.
  • Financers, incentive administrators, and permitting officials who review technical data for approvals.

Each party uses the same core data but may attach industry-specific exhibits such as engineering reports, incentive applications, or interconnection forms.

Step-by-step: Completing the Solar Energy Assessment Form

Follow these ordered steps to collect accurate site data and produce a useful assessment.

  • 01
    1. Gather: Collect utility bills, property title name, and site photos.
  • 02
    2. Inspect: Complete roof, shading, and structural observations during a site visit.
  • 03
    3. Estimate: Calculate recommended system size using historical usage and irradiance data.
  • 04
    4. Document: Attach diagrams, bill scans, and signatory approvals for records.

Key Sections to Include in a Professional Assessment Form

A complete form balances technical detail with clear signatory fields so reviewers can act on the report without follow-up.

Client Details

Owner name, preferred contact, mailing and service addresses, and any entity or DBA names used for contracts and permits.

Utility Data

12-month usage summary, demand data if available, utility account number, and bill uploads to support sizing and incentive eligibility.

Site Observations

Roof area, orientation, pitch, material, shading description, obstructions, and accessible mounting locations with photographs.

Structural Notes

Framing condition, attic access, load-bearing observations, and recommended engineering review if roof condition is uncertain.

System Recommendation

Proposed system size (kW), estimated annual production (kWh), estimated savings, equipment list, and preliminary cost range.

Authorizations

Signature, printed name, date, and fields for customer acknowledgements regarding access, photos, and utility bill release.

Security and Compliance Items to Capture

Encryption: TLS 1.2/1.3 in transit; AES-256 at rest
Audit Trail: Capture IP, timestamps, and action history
Identity Checks: Email/SMS, KBA or advanced authentication
HIPAA Support: HIPAA-compliant with BAA available
Regulatory Standards: SOC 2 Type II, ISO 27001 certified
Retention Controls: Tamper-evident storage and exportable copies

Practical Tips for Accurate Assessments

Applying consistent data and quality checks reduces rework and supports faster approvals across installers and funders.

Use recent bills
Upload the most recent 12 months of utility bills to ensure accurate sizing and incentive qualification.
Photograph systematically
Include labeled photos of each roof plane, electrical panel, and shading sources to avoid later site visits.
Confirm legal names
Match names to title or utility accounts to avoid delays in interconnection or financing.
Note conditions clearly
Document roof defects, planned roof work, or shading mitigation so estimates reflect realistic installation scope.

How to Configure an Online Assessment Workflow

Set up fields, authentication, and reminders so assessments flow from request to signed report with minimal manual steps.

Field Configuration
Authentication Method Email link | SMS code optional
Field Types Signature, date, dropdown, file upload
Conditional Fields Enable for roof type and financing options
Reminder Cadence 3, 7, and 14 day automated reminders

Typical Submission and Review Flow

A streamlined digital workflow reduces turnaround by combining data capture, photo uploads, and e-signature into one process.

  • Upload: Submit form, bills, and photos in one package.
  • Assign: Route to an auditor or installer for site review.
  • Sign: Customer and installer sign digitally with audit trail.
  • Deliver: Send signed report to customer and any financing parties.

Technical Options and Integrations

Choose a platform that supports required formats, identity checks, and integrations for your back-office systems.

  • Document Formats: PDF, DOCX, and image uploads supported
  • Integrations: Salesforce, Microsoft 365, NetSuite, Google Workspace
  • Storage: Box, Google Drive, or internal S3 storage

Verify the platform supports HIPAA if handling health-related or medical incentive data, and check for SSO, API access, and audit trails to meet compliance needs.

Typical Timing and Service Expectations

Timing varies by provider, local permitting, and whether financing or utility interconnection reviews are required.

Site Visit Scheduling:

Typically within 7–14 business days of request

Utility Bill Upload:

Customer provides within 10 business days to avoid delays

Assessment Report Delivery:

Commonly 7–21 business days after site inspection

Financing Application:

Deadlines vary by lender and incentive program

Permit Submission:

Dependent on local jurisdiction processing times

Key Milestones from Request to Decision

Follow these sequential milestones to track progress from initial request through installation decision.

01

Initial Request

Customer submits address, bills, and consent for access.

02

Site Survey

Auditor inspects roof, panel access, and shading.

03

Report Issued

Assessment with recommended system and cost estimate delivered.

04

Decision Point

Customer selects installer, financing, or declines the proposal.

eSignature Pricing Snapshot for Assessment Workflows

Compare common vendor starting prices and baseline feature availability; signNow appears first per platform comparison conventions.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies by plan Varies by plan Varies by plan Varies by plan
Bulk Send Yes Yes Yes Yes Varies
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Real-world Adoption Examples

Organizations across sectors use eSignature platforms to collect approvals, reduce turnaround, and maintain compliance.

Optica Ventures LLC

A mid-size project developer reduced paperwork for client onboarding and assessments.

  • Key benefit: easier customer handling.
  • The interface is simple and easy-to-use for our team; more importantly, it is just as easy for our customers. — Brian Fitzgibbons, COO

Martin Properties

A residential installer centralized assessments to multiple offices for consistent proposals.

  • Key benefit: consistent forms across crews.
  • I can process and execute all of these documents online with 100% compliance and built-in security. — Tim Martin, Founder

Common Preparation Errors to Avoid

  • Incomplete roof measurements lead to under- or over-sizing and require costly revisit trips.
  • Missing or partial utility history prevents accurate production and savings estimates and can delay lender approval.
  • Using inconsistent owner or account names causes verification failures and can trigger backup withholding or funding holds.
  • Poor quality photos or unlabeled attachments force manual follow-up and increase processing time.

Risks and Potential Consequences of Inaccurate Forms

Delay: Project and permit timelines
Funding Risk: Loan or incentive denial
Backup Withholding: 24% rate for incorrect TINs
Contract Voidance: Missing signature or consent
Regulatory Fines: HIPAA or consumer protection penalties
Reputational Harm: Customer disputes and claims

Frequently Asked Questions About the Form

Answers to common questions on e-signatures, notarization, signatory authority, and corrections for Solar Energy Assessment Forms.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users