Scope of Work
Describe system size, equipment models, inverter and module specs, mounting type, and the precise services to be provided from design through commissioning.
A well‑structured contract reduces misunderstandings about scope, timing, and payment, protects parties from liability, and clarifies responsibilities for permits, inspections, and utility interconnection. It also establishes remedies and preservation of rights if performance or payment disputes arise.
The Solar Energy Hub Contract is commonly completed by professionals and stakeholders across the project lifecycle, from procurement to commissioning.
Use this contract when parties need written allocation of risk, detailed technical specs, and an agreed payment and acceptance process for solar projects.
The individual or entity that owns the installation site and holds authority to approve permits and payments. They must confirm site control, utility account details, and sign financing or interconnection exhibits if required.
The licensed solar installer or EPC signing on behalf of the contractor. Responsible for permits, inspections, insurance, warranties, and coordination with subcontractors and utilities during project execution.
Describe system size, equipment models, inverter and module specs, mounting type, and the precise services to be provided from design through commissioning.
Set schedule for deposits, progress payments, holdbacks, final payment on commissioning, and any financing or lien provisions tied to payments.
Specify manufacturer and workmanship warranties, warranty durations, claim procedures, and remedies for defective equipment or poor installation.
Assign responsibility for permit applications, inspection coordination, interconnection paperwork, and payment of permit or utility fees.
Include target start and completion dates, milestone acceptance criteria, and delay provisions for weather or permitting hold-ups.
State insurance minimums, indemnification scope, certificates of insurance, and requirements for subcontractor coverage.
| Field | Configuration |
|---|---|
| Signature Field | Mandatory, required for each signer |
| Authentication | Email plus optional SMS code |
| Signing Order | Sequential for approvals, flexible for parallel execution |
| Copies Distribution | Automatic PDF to all parties |
Confirm platform support for file formats, authentication, and integrations before eSigning official contract copies.
Verify the chosen provider offers an audit trail, tamper-evident signed PDFs, and retention capabilities that meet your compliance needs.
Contract effective date and anticipated start of physical work.
Target date to file local permits and interconnection applications.
Expected delivery dates for modules and inverters.
Target date for system testing and utility permission to operate.
Start date for warranty protections post-commissioning.
Optica used standard contracts to streamline customer signings across multiple projects.
A property manager adopted electronic contracting for onsite and remote transactions.