Scope of Work
Detail the system components, array layout, inverter models, performance estimates, mounting method, and any exclusion items so both parties share the same technical expectations.
A formal agreement reduces project risk by assigning responsibilities for permits, inspections, equipment warranties, and interconnection. It provides a roadmap for payments, change orders, and remedies if schedules slip.
The Solar Panel Installation Agreement is used by parties involved in delivering solar projects: installers, homeowners, property managers, and financiers.
All signatories should confirm identity, authority, and acceptance of payment and permitting obligations before signing.
Detail the system components, array layout, inverter models, performance estimates, mounting method, and any exclusion items so both parties share the same technical expectations.
Specify total price, deposit, progress payments linked to milestones, final payment conditions, retainage, acceptable payment methods, and consequences for late payment.
Identify which party obtains building, electrical, and interconnection permits, permit timelines, and responsibilities for coordination with utility or AHJ inspections.
State equipment manufacturer warranties, installer workmanship warranty, production guarantees if any, and testing/acceptance criteria to measure output.
Define how scope changes are documented, priced, approved, and scheduled to prevent informal on-site modifications from becoming disputes.
Allocate insurance requirements, indemnities, limitation of liability, delay damages, termination rights, and dispute resolution methods including governing law.
| Field | Configuration |
|---|---|
| Signer Order | Sequential or parallel routing per project roles |
| Authentication | Email link with optional SMS or KBA for higher assurance |
| Conditional Fields | Show payment or warranty fields only when selected options apply |
| Notifications | Automatic reminders for unsigned documents and milestone completions |
Choose a platform that supports required authentication, integrations, and compliance features appropriate to your project and industry.
Integrations streamline document routing, payment reconciliation, and record retention across project management and accounting systems.
Date by which required permit applications must be filed
Anticipated start date and allowable delays
Scheduled date for AHJ and utility inspection
Performance testing and interconnection completion date
Payment due upon verified commissioning and acceptance
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
A homeowner requests a turnkey installation with net-metering eligibility
A commercial owner seeks on-site generation with tax-credit financing