Site Summary
Project name, address, coordinates, brief description of site use, and relevant site history such as previous fills or remediation.
A consistent template reduces errors, speeds internal reviews, and creates an auditable record of design assumptions. It helps align multidisciplinary teams, supports regulatory and permitting submissions, and makes it easier to compare alternatives across sites and projects.
The Subsurface Design Template is used by professionals across the project lifecycle to record technical findings, author design recommendations, and document acceptance criteria.
The template also serves owners and permitting authorities as a concise, consistent summary of subsurface conditions and the technical basis for proposed construction methods.
Project name, address, coordinates, brief description of site use, and relevant site history such as previous fills or remediation.
Borehole and test pit logs with depths, sampling intervals, standard penetration test values, and groundwater observations.
Grain-size, Atterberg limits, unit weight, consolidation, shear strength, and any special testing like triaxial or permeability.
Adopted soil and rock parameters for bearing capacity, modulus values, allowable settlements, and factors of safety.
Preferred foundation systems, earthwork and compaction specifications, dewatering needs, and monitoring requirements.
Scope limitations, sitespecific uncertainty, recommended contingencies, and required verification during construction.
| Field | Configuration |
|---|---|
| Upload Source | CSV import or manual entry |
| Review Order | Geotech -> Structural -> QA |
| Authentication | Email + optional SMS code |
| Storage Format | PDF/A with embedded metadata |
Choose a platform that supports PDF, DOCX, and mobile entry, and that meets your compliance needs.
Ensure the platform you choose can produce an audit trail and store exported signed PDFs in your document management system.
1–4 weeks depending on site size and access
7–21 days based on test scope
3–10 business days for internal review
1–5 business days after engineer signatures
Varies by authority; allow 2–12 weeks
Project managers typically approve distribution and confirm that reports were prepared under the stated scope; their sign-off confirms administrative completeness and routing to stakeholders.
A licensed professional engineer (PE) signs and dates technical conclusions and recommendations; that signature is the legal attestation of professional responsibility for design decisions.
Ensure signature blocks, dates, and signatory titles are present
In-person notarization or Remote Online Notarization (RON) if supported
Provide government ID and follow the notary or RON provider requirements
Add witnesses if the jurisdiction or instrument requires them
Notary retains journal or RON session per state rules
Include notary acknowledgement or certificate with the archived file
Supply notarized copies to contract parties and retain master copy
Record notarization date in project records
A municipal redevelopment required rapid assessment of legacy fill and groundwater conditions.
A state DOT used the template for multiple segments with similar soils.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |