Scope of Work
Define treated areas, methods (soil treatment, baiting), frequency, and exclusions. Specify structural areas like crawlspaces to avoid disputes over coverage.
Using a Termite Treatment Pre-Treat Agreement clarifies obligations, documents product and method details, and sets warranty and follow-up terms so both contractor and owner understand expectations and reduce disputes.
Typical parties who prepare, review, or sign a pre-treat agreement include property owners, licensed pest control firms, property managers, and real estate closing professionals.
Verify the signatory has authority to bind the property owner or management company and confirm any third-party requirements (lender, title, or municipal) before execution.
| Field | Configuration |
|---|---|
| Signer Order | Owner signs first, then contractor for clear authorization. |
| Authentication | Email link with optional SMS code for additional verification. |
| Attachments | Include inspection photos, product labels, and license copies. |
| Notifications | Automated reminders at 3 and 7 days for outstanding signatures. |
Typical platform and integration requirements to create, send, and store this agreement securely for recordkeeping.
Define treated areas, methods (soil treatment, baiting), frequency, and exclusions. Specify structural areas like crawlspaces to avoid disputes over coverage.
List pesticide trade names, EPA registration numbers, concentrations, and safety or reentry instructions so owners and regulators can verify label compliance.
Describe required access times, utility shut-offs, occupant preparations, and instructions for pets or sensitive equipment to ensure safe application and compliance.
Provide itemized pricing, payment schedule, accepted methods, and late fee terms. Clarify responsibility for extra work or follow-up treatments and authorization process.
State warranty duration, coverage limits, exclusions for structural damage or new infestations, and the procedure to request reinspection or corrective work under warranty.
Include signature blocks for each party with printed names, titles, dates, and space for witness or notary acknowledgment where lender or local law requires it.
Schedule inspection 7–14 days before planned treatment
Treatment to commence within agreed 3–7 business days
Follow-up inspection typically 30–90 days after treatment
Owner must report issues in writing within warranty period
Keep signed agreement and attachments for recommended retention
Document infestation evidence, structure access, and recommended treatments
Provide price and obtain signed authorization to proceed
Apply products per label and record application details
Schedule reinspection and record findings and corrective work
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/yr | No cap | No cap | No cap |
A regional property manager schedules pre-closing pre-treats to satisfy lender and disclosure requirements for sales.
A licensed pest control company documents chemical labels, application rates, and warranty terms before service.