Parties and Scope
Identify owner, contractor, and a detailed scope of work including site preparation, connections, tank mounting requirements, and any subcontracted components or services.
A documented installation agreement clarifies risk allocation, ensures compliance with local permits, and creates enforceable payment and warranty terms. It reduces misunderstandings, supports insurance and lien management, and provides a defined basis for dispute resolution if performance or safety issues arise.
Property owners, licensed contractors, and project managers commonly use a Water Tank Installation Agreement to coordinate work and secure approvals.
Having defined roles and signatories reduces delays with permitting authorities and streamlines handoff to inspectors and operation teams.
The owner or authorized representative signs to accept scope, authorize payments, and confirm site access. Their signature confirms site-specific conditions, payment terms, and any easements or access agreements needed for installation.
A licensed contractor signs to accept the scope, warranty obligations, permitting duties, and safety responsibilities. The contractor’s signature should be accompanied by license number, insurance certificate references, and a primary contact for inspections and change orders.
| Field | Configuration |
|---|---|
| Signature Workflow | Sequential signing by owner then contractor |
| Authentication | Email link with optional SMS code verification |
| Conditional Fields | Show permit section only if owner selects 'owner obtains permit' |
| Storage | Encrypted PDF archived in project folder |
Ensure your eSignature platform supports required authentication, audit trails, and secure long-term storage for compliance.
Use a provider that offers audit trails, optional advanced signer authentication, and searchable archived records to simplify inspections and disputes.
Submit before mobilization; municipal review varies by jurisdiction
Confirm manufacturer delivery windows in contract schedule
Coordinate inspection within 48–72 hours of request
Defined final acceptance date and punch-list window
Begins on final acceptance or specified commissioning date
Agreement signed and deposit paid to begin procurement and permitting.
Permits filed and tank materials ordered; lead times confirmed.
Site preparation, installation, then municipal or third-party inspection.
Hydrostatic and operational tests completed and final payment issued.
Identify owner, contractor, and a detailed scope of work including site preparation, connections, tank mounting requirements, and any subcontracted components or services.
State manufacturer, model, materials, capacity, coatings, and acceptable tolerances; reference attached product data sheets and engineering drawings as exhibits.
Allocate responsibility for permit applications, inspection scheduling, and corrective actions required by authorities having jurisdiction.
Specify deposit, milestone payments tied to inspections or delivery, retainage amount, final payment conditions, and accepted payment methods.
Define manufacturer warranties and contractor workmanship warranty, including duration, notice procedures, and repair or replacement remedies.
Require contractor lien waivers upon payment and maintain specified insurance levels with owner named as certificate holder where applicable.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | No | No | No | No |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |