Report Header
Project name, location, client, inspector credentials, inspection date, and reference to contract documents or applicable welding standards for traceability and acceptance.
A consistent, detailed report creates an auditable record of weld condition and corrective actions, reduces rework, and documents compliance with project specifications and applicable codes. Clear inspection records help resolve disputes, support warranty claims, and provide evidence for safety reviews and regulatory inspections.
Typical users include on-site inspectors, QA/QC managers, contractors, owners, and permitting authorities who need a reliable written record of welded pile condition and any required repairs.
| Field | Configuration |
|---|---|
| Required Fields | Mark inspector name, date, pile ID mandatory |
| Attachment Rules | Require at least two photos and NDT log upload |
| Authentication | Use email plus SMS code or stronger signer verification |
| Routing | Auto-send final PDF to QA, contractor, and owner |
Choose a platform that supports PDFs, photo attachments, audit trails, and the integrations your project uses.
Ensure the chosen tool meets your security, retention, and verifier requirements before standardizing the workflow across the project team.
Project name, location, client, inspector credentials, inspection date, and reference to contract documents or applicable welding standards for traceability and acceptance.
Specify weld type, procedure, electrode or filler used, welding parameters, and reference codes or welding procedure specifications (WPS) used on the pile.
Include non-destructive testing methods, equipment used, acceptance criteria, measured values, and clear pass/fail status for each tested area.
Record dimensions, offsets, verticality, and other measured values with units and measurement tolerance compared to contract tolerances.
Attach date‑stamped, labeled photos showing defect location and orientation; reference photo IDs where they correspond to findings.
Summarize deficiencies, recommended repairs, responsible party, target completion dates, and final acceptance or rejection statement with signature lines.
Upload preliminary findings within 24–48 hours of inspection
Deliver fully documented report with attachments within 7 days
Contract may specify repairs within 14–30 days after notice
Owner or engineer typically has 7–14 days to accept or reject
Move final signed report to long-term storage within 30 days
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card required | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |