Project ID
Unique identifier, project name, location, and drawing references so the report links to project documentation and change records for traceability.
A complete report reduces rework, supports claims and warranties, documents code compliance, and provides evidence for incident review. It helps teams resolve disputes and verify that welds meet applicable standards and client specifications.
Organizations and individuals who rely on welding reports include project owners, contractors, inspectors, and quality managers.
Records serve internal teams, external stakeholders, and regulators during commissioning, audits, and incident investigations.
Unique identifier, project name, location, and drawing references so the report links to project documentation and change records for traceability.
Concise description of welding tasks performed, joint types, weld sizes, welding processes, and any deviations from approved scope or specifications.
Material heat numbers, filler metal lot numbers, base material specs, and traceability details that support material verification and warranty claims.
WPS and PQR references, welding parameters (amperage, voltage, travel speed), preheat/postheat and any procedural departures recorded with approval metadata.
Visual inspection results, NDT method details (UT, RT, MT), acceptance criteria, technician certifications, and image or log attachments for evidence.
Safety observations, confined-space entries, permits issued, applicable codes or standards cited, and signatures of responsible parties for compliance records.
| Field | Configuration |
|---|---|
| Required Fields | Mark weld ID, inspector, date as mandatory |
| Conditional Fields | Show NDT fields only if inspection required |
| Routing | Route to QA after inspector signs |
| Storage | Archive signed PDF to project folder |
Choose formats and platforms that preserve signatures, attachments, and audit trails across stakeholders.
Ensure platforms support secure storage, tamper-evident signed PDFs, and retention policies aligned to your regulatory or contract requirements.
Record weld activity and inspection notes by end of each shift.
Provide completed reports before system commissioning or pressure testing.
Respond to inspection nonconformances within the timeframe set by the project (commonly 48–72 hours).
Deliver the full report package at project closeout per contract schedule.
Store signed records promptly after acceptance to meet retention policies.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | Varies |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No envelope cap | 100 envelopes/user/year limit | Varies | Varies | Varies |
The interface is simple and easy-to-use for our team; more importantly, it is just as easy for our customers.
I can process and execute all of these documents online with 100% compliance and built-in security.