Identification
Record job number, location, component ID, drawing revision, joint numbers, and any serial or heat numbers so each weld can be directly matched to fabrication records and material certificates.
A Welding Report provides objective evidence that welding met specified procedures and acceptance criteria, helps identify defects early, documents corrective actions, and supports contractual and regulatory obligations. Accurate reports reduce rework and preserve traceability.
Welders, welding inspectors, QA/QC engineers, and project managers typically prepare or review Welding Reports on-site or in the office.
Copies are retained by the contractor, owner, and any certifying agency to maintain traceability and meet audits.
Record job number, location, component ID, drawing revision, joint numbers, and any serial or heat numbers so each weld can be directly matched to fabrication records and material certificates.
Specify base metal types and grades, filler metals, batch or heat numbers, manufacturer, and applicable material certificates to enable traceability and warranty validation per project specification.
Cite the specific Welding Procedure Specification (WPS), preheat and interpass temperatures, current, voltage, travel speed, shielding gas, and any deviations from approved procedures with rationale provided.
Include welder name, certification ID, test date, accepted qualification range, and employer so that all welders are validated against applicable codes and retain supporting test records in file.
Summarize visual inspection findings, NDT method(s) used, acceptance criteria, any indications found, measurement data, and final acceptance or rejection decisions with referenced inspection reports attached.
Describe remedial work, repair procedures, re-inspection results, disposition of rejected welds, and authorization signatures for closure of nonconformances including dates, personnel, and any follow-up testing performed to verify effectiveness.
| Field | Configuration |
|---|---|
| Required Fields | Make WPS, material certs, inspector, and signature required for submission. |
| Routing | Auto-route to QA and project manager based on project code. |
| Attachments | Allow multiple uploads; require NDT reports and weld images. |
| Authentication | Enable email link with optional SMS code or KBA for high-risk projects. |
Choose a platform that supports PDF, Word import, audit trails, and secure storage when digitizing Welding Reports and signatures.
Submit report within 48 hours of weld completion.
Signed and dated by inspector within 7 days.
Attach NDT reports before final acceptance.
Retention begins on report finalization date.
Raise welding disputes within contract-defined period.
Weld performed and parameters logged immediately.
Inspector records findings; NDT completed per procedure.
QA accepts or rejects; corrective actions initiated.
Signed report and attachments filed in controlled repository.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies | Varies | Varies |
A general contractor used structured Welding Reports to document all welds on a bridge span, consolidating NDT findings and repair logs into a single record for the owner.
A fabrication shop recorded daily Welding Reports for pressure vessel welds, including welder IDs, WPS references, and heat numbers to satisfy code inspectors.