FENCING CONTRACT

THIS FENCING CONTRACT (“Contract”), effective as of the date of the last party to sign below, is between , having an address at (“Contractor”) and , having an address at (“Owner”).

For valuable consideration the parties hereby agree as follows:

1. SCOPE OF WORK: Fencing is the use of chain link, wrought iron, vinyl or wood materials to construct, erect, alter, or repair all types of fences, corrals, runs, railings, cribs, game court enclosures, guard rails, barriers and gates. Fencing services include locating buried utility lines, cables and pipes in the digging area and determining local zoning requirements, as well as neighborhood or subdivision restrictions for height, type, style and position. Contractor shall provide all necessary fencing labor and materials, and perform all fencing services described above and/or as set forth in the plans and specifications signed by both Owner and Contractor (“Project”). Such plans and specifications are hereby made a part of this Contract and may contain pictures, diagrams or measurements of the work area together with a description of the work to be done, materials to be used, and the equipment to be used or installed.

2. WORK SITE: The Project shall be constructed on the property of Owner located at and more particularly described as (hereafter "the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and customary excavation and grading on the Work Site as may be required in the judgment of the Contractor to complete the Project. Unless called for in the plans or specifications, no landscaping, finish grading, filling or excavation is to be performed at the Work Site by the Contractor.

3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this Contract on or before and shall substantially complete the work on or before . Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty, acts of God, illness, injury, or general unavailability of materials.

4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may be required by the local municipal/county government, the cost thereof shall be included as part of the Project price.

5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the soils at the Work Site. Any excavation, filling or other work required by the Owner other than the usual and customary excavation and grading shall be agreed to in a Change Order for an amount in addition to the Contract Price. Contractor shall not be responsible for any damages suffered by Owner as a result of the soil conditions at the Work Site.

6. INSURANCE: Contractor shall maintain general liability and workers compensation, as well as builder's risk insurance, if applicable.

7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point out property lines to the Contractor. If the Owner or Contractor has any doubt about the location of the property lines, Owner shall provide Contractor with boundary stakes through a licensed surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that affect the Work Site.

8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work, including changes to the plans and specifications, from time to time during the construction of the Project. However, any such change or modification shall only be made by written "Change Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the estimated cost.

9. CONTRACT PRICE:

{COST PLUS}

Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of $ for performing the services set forth in the scope of the work. Contractor shall be paid as follows:

OR

{FIXED FEE}

Owner agrees to pay Contractor the sum of $ for performing the services set forth in the scope of the work. Contractor shall be paid as follows:

Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or materials provided at the time the next periodic payment shall be due.

10. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10) days from the due date shall be deemed a material breach of this Contract. If payment is not made when due, Contractor may suspend work on the job until such time as all payments due have been made without breach of the Contract pending payment or resolution of any dispute. Owner agrees to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the rate of 1% per month.

11. RIGHT TO CURE: Contractor shall have the right to cure a defect before Owner may file any action in court against Contractor. See the “Notice of Potential Claims Must be Provided within One Year” attached hereto and made a part of this Contract.

12. DESTRUCTION AND DAMAGE: If the Project is destroyed or damaged for any reason, except where such destruction or damage was caused by the sole negligence of the Contractor or its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in rebuilding or restoring the Project to its condition prior to such destruction or damage. If the estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by either party, Contractor shall be excused from further performance under this Contract and Owner shall pay Contractor a percentage of the Contract price in proportion to the amount of work accomplished prior to the destruction or damage.

13. ASSIGNMENT: Neither party may assign this Contract, or payments due under the Contract, without the other party’s written consent. Any such assignment shall be void and of no effect.

14. INTERPRETATION:

(a) Interpretation of Documents. The Contract, plans, and specifications are intended to supplement one another. In the event of a conflict, the specifications shall control the plans, and the Contract shall control both. If work is displayed on the plans but not called for in the specifications, or if the work is called for in the specifications but not displayed on the plans, Contractor shall be required to perform the work as though it were called for and displayed in both documents.

(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other agreements, oral or written, pertaining to the work to be performed under this Contract exists between the parties. This Contract may only be modified by a written agreement signed by both parties.

(c) Governing Law. This Contract shall be interpreted and governed in accordance with the laws of the State of Alaska.

15. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action against the other party arising from or relating to this Contract, the prevailing party in such proceeding shall be entitled to recover reasonable attorney fees and court costs.

16. PERFORMANCE:

(a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant to this Contract provided Contractor shall remain fully responsible for the proper completion of the Project.

(b) All work shall be completed in a workman-like manner and in compliance with all building codes and applicable laws. To the extent required by law, all work shall be performed by individuals duly licensed and authorized by law to perform said work.

(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.

17. WARRANTY: Contractor's warranty shall be limited to defects in workmanship within the scope of work performed by Contractor and which arise and become known within one (1) year from the date hereof. All said defects arising after one (1) year and defects in material are not warranted by Contractor. Contractor hereby assigns to Owner all warranties on materials as provided by the manufacturer of such materials.

AGREED:

CONTRACTOR:

Signature

Print Name & Title

Date

License Number

Name and Address of License Holder

OWNER:

Signature

Print Name

Date

NOTICE OF POTENTIAL CLAIMS MUST BE PROVIDED WITHIN ONE YEAR

ALASKA LAW AT AS 09.45.881-09.45.899 CONTAINS IMPORTANT REQUIREMENTS THAT YOU MUST FOLLOW BEFORE YOU MAY FILE A COURT ACTION FOR DEFECTIVE DESIGN, CONSTRUCTION, OR REMODELING AGAINST THE DESIGNER, BUILDER OR REMODELER OF YOUR HOME. WITHIN ONE YEAR OF THE DISCOVERY OF A DESIGN, CONSTRUCTION, OR REMODELING DEFECT, BEFORE YOU FILE A COURT ACTION, YOU MUST DELIVER TO THE DESIGNER, BUILDER OR REMODELER A WRITTEN NOTICE OF ANY DESIGN, CONSTRUCTION, OR REMODELING CONDITIONS YOU ALLEGE ARE DEFECTIVE IN ORDER TO PROVIDE YOUR DESIGNER, BUILDER, OR REMODELER WITH THE OPPORTUNITY TO MAKE AN OFFER TO REPAIR OR PAY FOR THE DEFECTS.

YOU ARE NOT OBLIGATED TO ACCEPT ANY OFFER MADE BY THE DESIGNER, BUILDER OR REMODELER. THERE ARE STRICT DEADLINES AND PROCEDURES UNDER STATE LAW, AND FAILURE TO FOLLOW THEM MAY AFFECT YOUR RIGHT TO FILE A COURT ACTION. ALASKA LAW AT AS 09.45.895 CONTAINS LIMITATIONS TO THE AMOUNT OF DAMAGES THAT MAY BE RECOVERED IN A COURT ACTION FOR DEFECTIVE DESIGN, CONSTRUCTION OR REMODELING.

Enter text✕

What a Fencing Contract for Contractor Alaska Covers

A Fencing Contract for Contractor Alaska is a written agreement that sets the scope, materials, schedule, price, and responsibilities for building or repairing a fence on private or public property in Alaska. It clarifies who supplies labor and materials, inspection and permitting responsibilities, payment milestones, change-order procedures, insurance and indemnity terms, and warranty language specific to fencing work and local conditions. The contract reduces disputes by documenting expectations for access, site preparation, cleanup, utility checks, and any required municipal permits or right-of-way approvals in Alaska.

Why a Clear, Alaska-Specific Fencing Contract Matters

A precise contract protects both contractor and property owner by allocating risk, defining deliverables, and creating enforceable payment and remedy terms. For Alaska projects, local permit needs, seasonal constraints and access logistics make a written agreement especially important.

Why a Clear, Alaska-Specific Fencing Contract Matters

Who Typically Uses the Fencing Contract for Contractor Alaska

This contract is used by parties engaged in fence construction, repair, or replacement where work occurs in Alaska.

  • Licensed contractors and subcontractors performing installation, repair, or replacement of residential, commercial, or agricultural fences in Alaska.
  • Property owners, land managers, homeowners associations, and developers who need written terms for scope, access, and payment.
  • Public agencies or utilities contracting private vendors for right-of-way or security fencing projects.

Use the contract to document responsibilities, confirm permits and inspections, and create a clear payment and dispute-resolution pathway.

Step-by-Step: Filling Out the Fencing Contract

Follow this sequence to complete the contract cleanly and reduce negotiation friction.

  • 01
    Prepare Estimate: Draft scope and itemized cost estimate.
  • 02
    Insert Parties: Add legal names and contact details.
  • 03
    Set Schedule: Add start, milestones, and completion dates.
  • 04
    Sign and Exchange: Both parties sign and retain dated copies.

Typical Contract Workflow from Quote to Closeout

A standard workflow helps coordinate permits, site access, approvals, and final acceptance.

  • Quote Issued: Contractor provides itemized fencing proposal.
  • Contract Signed: Parties sign to confirm terms and deposit.
  • Permits and Prep: Obtain permits and complete site prep.
  • Final Inspection: Owner acceptance and final payment release.

Digital Workflow Settings for Online Completion

Configure a consistent online workflow to capture signatures, authentication, and retention settings.

Field Configuration
Authentication Method Email link or SMS code
Signing Order Sequential or parallel signers
Template Library Save as reusable contract template
Notifications Email reminders and completion notices

Digital Signing and Platform Considerations

Consider authentication strength, audit trail detail, and export formats before e-signing.

  • File Types: PDF, DOCX supported
  • Integrations: Google Workspace, Microsoft 365
  • Auth Options: Email, SMS, KBA, SSO

Choose settings that meet contractual risk tolerance, regulator expectations, and any industry compliance such as HIPAA or 21 CFR Part 11 where applicable.

Essential Clauses for a Professional Fencing Contract

Include clear, specific clauses that allocate responsibility, define acceptable materials, and provide remedies for delays or defects.

Scope of Work

Precisely define tasks—post spacing, height, gate types, finish, removal of existing fence, site restoration, and any exclusions to prevent scope creep and disputes.

Materials and Standards

Specify materials by grade and manufacturer where relevant, acceptable substitutes, fastening details, and compliance with local building codes for load and frost conditions.

Payment Terms

Detail contract sum, deposit, milestone payments, retention, final payment conditions, and interest on late payments to reduce payment-related disputes.

Schedule and Delays

List start and completion dates, weather allowances, permit-dependent delays, and notification obligations to manage timing expectations.

Change Orders

Require written change orders for scope or price changes, specify approval process, and attach cost/time adjustments to preserve clarity and accountability.

Warranties & Liability

State workmanship and material warranty periods, remedies for defects, insurance requirements, and limits on consequential damages to allocate risk.

Security and Compliance Elements to Include

Encryption: TLS 1.2/1.3, AES-256 at rest
Audit Trail: Timestamps, IP, signer events
Access Controls: Role-based document access
BAA Availability: HIPAA BAA if required
Authentication: Email, SMS, KBA, SSO
Retention: Exportable, tamper-evident PDFs

Key Risks and Consequences of an Incomplete Contract

Missing Signature: Potential unenforceability
Unclear Scope: Change-order disputes
No Permit Plan: Project stoppage risk
Absent Insurance: Exposure to liability
Late Payments: Collection costs and liens
Improper Retention: Recordkeeping noncompliance

Common Mistakes to Avoid When Preparing a Fencing Contract

  • Vague scope language that omits critical dimensions, materials, or gate specifications and leads to scope disputes and cost overruns.
  • Failing to confirm who secures permits or utilities locate services, causing delays and liability for permit-related violations.
  • Not specifying payment milestones or retainage which creates ambiguity about partial payments and final acceptance criteria.
  • Using informal text messages or emails instead of signed change orders, leading to enforceability problems and mismatched expectations.

Typical Deadlines and Processing Expectations

Key dates and timelines reduce misunderstandings and help coordinate permitting, inspections, and payments.

Effective Date:

Date contract obligations commence; use MM/DD/YYYY format.

Start of Work:

Date work may begin subject to permits and weather windows.

Substantial Completion:

Milestone for major system completion and interim payments.

Final Completion:

Acceptance date when final payment and punch-list resolution occur.

Permit Deadlines:

Obtain permits before start; timelines vary by municipality.

Project Milestones from Bid Through Final Payment

A milestone timeline keeps stakeholders aligned and clarifies payment triggers.

01

Bid & Estimate

Contractor prepares itemized bid and delivers it to owner.

02

Contract Signing

Parties sign agreement and contractor schedules start date.

03

Site Prep & Permits

Permits obtained and site prepared prior to construction.

04

Completion & Final Payment

Final inspection, punch-list completion, and release of final payment.

eSignature Pricing Comparison Relevant to Contract Execution

Compare base pricing, trial availability, bulk send capability, audit trail availability, HIPAA compliance, and envelope caps across leading vendors; signNow appears first for column consistency.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies by plan Varies by plan Varies by plan Varies by plan
Bulk Send Yes (premium) Yes (plan) Yes (plan) Yes Limited
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No
Envelope Cap No cap 100 envelopes/user/year Varies by plan Varies by plan Varies by plan

Frequently Asked Questions About the Fencing Contract for Contractor Alaska

Answers address validity, notarization, signing authority, change orders, lien exposure, and retention tailored for Alaska projects.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users